How to start a bathroom renovation? Do-it-yourself bathroom renovation is the easiest work option available to everyone.

How to make repairs in the bathroom, so that later you do not have to do the whole procedure again, correcting the shortcomings? This is a rather serious question that worries everyone who has the idea to remake given type premises.

Do-it-yourself bathroom renovation may seem daunting task. In some way, this is how it is - for decoration, installation of equipment, electricians and other things, at least initial construction skills are certainly required. Bathroom and renovation actual question for all time.

At the same time, it is worth noting that it is possible to start an independent comprehensive bathroom renovation only if there is a strong confidence in own forces and experience. Alteration in the bathroom is almost always associated with additional communications - plumbing, sewerage or gas pipes. Poor installation can cause an accident, which will lead to flooding not only of the bathroom itself, but also of the premises on the lower floors.

Perhaps for inexperienced craftsmen the best option will refuse to repair the bathroom in the house and entrust this work to hired specialists who will quickly and efficiently carry out any work in terms of complexity. If do-it-yourself bathroom renovation is the only possible variant so that the whole process goes smoothly and without problems, it is better to be guided by a number of recommendations. Bathroom renovation tips will help you complete the work efficiently and on time.

Bathroom renovation - is it that difficult?

The bathroom is a place where a humid climate is constantly maintained. After hygiene procedures, moisture settles on the walls, ceiling and floor of the room in the form of condensate. This is precisely what the main problem which complicates construction works in the bathroom with your own hands. Classic Decoration Materials, such as wood or wallpaper in such a room are of little use. How to renovate a bathroom in accordance with all safety and quality requirements?

For many, the problem of renovating a bathroom becomes a real nightmare in reality. A wide range of consumables and finishing materials, plumbing and tools for work is confusing, and it becomes difficult to understand where to start work, how long it will take and what investments it will require. To understand this, first you need to decide how deep you need to make repairs in the bathroom. This is a decisive factor that will form an idea of ​​the whole process.

The following bathroom renovation options are available:

  • cosmetic;
  • capital.

In the first case, no major alteration work is carried out. All that is required is the replacement of an outdated finish with a new one, in rare cases, an update of plumbing or simple communications (for example, replacing a clothes dryer). Such a partial renovation of the bathroom does not take much time and effort. Also, in most cases, it does not require significant cash outlays.

Bathroom remodeling is a challenge on a different level. As a rule, alteration from scratch is required for very old premises with a completely faulty communication system and non-working plumbing, as well as for new rooms without finishing. It is not always possible to make a complete repair quickly. This is a complex multifaceted process that requires careful preparation and high level professionalism from the master. For this reason, complex bathroom renovations are most often trusted by specialists.

What are the steps for a bathroom renovation?

The bathroom and its repair is a topical issue at all times. Having decided to start the alteration on your own, you should follow a certain sequence in your actions. Chaotic work can cause errors that lead to unreasonable additional expenses that the owners of the bathroom do not need. That is why it is so important to follow the order of renovation in the bathroom.

An approximate sequence of repairs in the bathroom is as follows:

  1. Remodeling planning.
  2. Preparatory work in the room.
  3. We do waterproofing.
  4. Installation of communications (sewerage, plumbing, heating).
  5. Electrical work.
  6. Finishing works (plastering, finishing).
  7. Installation of the ventilation system and installation of equipment.

Depending on whether it is produced redecorating bathroom or capital, some items from this list can be removed - however, in most cases, all of the above stages are the main ones during the work. How to make repairs in the bathroom correctly and efficiently, without missing important nuances, detailed below.

Stage 1. Planning for rework

The first question that comes to mind is where to start renovating a bathroom? Actually, the beginning of any repair work in an apartment or house is preceded by the planning stage. In order to clearly imagine the scope of future work, as well as the expenses that have to be made for the purchase Supplies, plumbing and necessary tools a detailed remodeling project should be drawn up.

A phased do-it-yourself bathroom renovation begins precisely with a work plan and drawing up a future interior. Such things are most often done by professional hired designers - they will help make the bathroom beautiful and unique. Now in almost any city you can find a lot of agencies offering interior design services for all types of premises - including bathrooms.

The design project includes many aspects of the future renovation - for example, the arrangement of the bathroom, the list of materials needed for work and their cost, deadlines, and much more. In other words, this detailed instructions, with which you can make high-quality step by step repair bathroom.

If circumstances do not allow you to seek help from a specialist, you can draw up a project yourself.

A huge amount of free software is available on the Internet, with which even a novice computer user can create a three-dimensional 3D model of the future room.

To do this, it is enough to know total area bathroom and its exact plan. But how to equip the bathroom will no longer be decided by the designer, but by the owner himself, based on his own tastes.

  • ceramic tiles (optimal cost option);
  • plastic panels (economical and high-quality material);
  • porcelain stoneware (durable, but quite an expensive option for finishing).

These finishing materials are ideal for the bathroom. They are durable, heat-resistant and tolerate high humidity. This is extremely important, because with insufficient hydrophobic properties of the materials used for exterior finish, there is a high risk not only of their damage, but also the development of mold and fungus - and this already makes repairs hazardous to health.

Stage 2. Preparatory work in the room

Having started the renovation of the bathroom on your own and having decided on the amount of work to be done, it is necessary to prepare the room directly for the process. To do this, it should be completely cleared of obsolete appliances, finishes and communications - how to repair a bathroom if it is clogged with construction debris?

The dismantling process is greatly accelerated by the presence of a perforator and a set of special drills. With this tool, you can easily remove the old layer of tiles, dried adhesive mixtures, plaster. It is necessary to act as quickly as possible, but carefully - the walls of the bathroom should eventually be completely cleaned of traces of previous repairs.

Next to the walls, you should get rid of the cement screed on the floor. However, if over the years of service it has not lost its functionality and at the moment current repair it seems quite reliable, you can use it as a base, after cleaning it with a grinder with a diamond nozzle-circle. The repaired floor will significantly reduce the time and amount of rework.

However, at the slightest sign of destruction (chips, cracks, visible irregularities), it is better to dismantle and fill the floor again.

After construction garbage has been removed from the premises, the comprehensive renovation of the bathroom can be continued. All cleaned surfaces should be carefully primed with special compounds (you can buy them at any hardware store).

Stage 3. Waterproofing procedures

After preparing the surfaces, construction work should begin with the laying of a waterproofing layer. This is a very important part of the renovation. It is on the quality of waterproofing that the calmness of the owners and neighbors from below will depend, because in the case emergencies it should prevent the penetration of moisture under the floor.

To protect against water, a special waterproofing film is used. In specialized stores for repairs in the bathroom, it is made from the following materials:

  • aquaizol;
  • polyester.

Laying the waterproofing layer yourself is quite simple. To do this, you just need to follow certain rules. For example, when laying on a surface, the film must be carefully checked for integrity. When calculating the right amount of material, it should be borne in mind that the film should lie on the floor with a margin of 15-20 centimeters. At the same time, it is not necessary to cut it along the edges - just gently bend it.

Do-it-yourself repair also involves insulating joints if the dimensions of the room are too large compared to the width of the film. It can be done with the help of a special tool - building hair dryer- or with the help of a special mastic.

Stage 4. Installation of communications

The next stage is the holding of all kinds of pipes to ensure the health of the plumbing. Like all stages of bathroom renovation, it requires special care during the work.

Do-it-yourself bathroom renovation is almost always associated with the installation of plumbing and sewage systems. How to conduct communications yourself and what is needed for this?

First, before you install, you should take care of drawing up a pipeline diagram. IN modern apartments and at home, all communications are usually collected in one "bundle", which runs along the most convenient wall of the room. In the future, it is masked by tiling or plastic. For individual elements plumbing system(e.g. for installation of built-in mixers) wall chasing may be required. This occupation is quite laborious, but it allows you to hide communications in the thickness of the wall so that they do not spoil the interior of the bathroom with their appearance.

Secondly, for starters, it is better to install the sewer. This is the easiest step that can be done in just a couple of hours if you have the right amount pipes, couplings and sealant.

Further, a comprehensive bathroom renovation involves the installation of plumbing. The best material to use polypropylene pipes- they are inexpensive and at the same time as reliable as possible. Fittings for them should also be purchased from plastic, this will avoid additional spending on metal products. Polypropylene pipes for correct installation serve more than 10 years and can safely hide in the walls. The risk of leakage in this case is minimal.

If the bathroom has a system central heating, then installation of the coil will also be required.

Stage 5. Electrical work

Wiring, by definition, does not tolerate high humidity very well. What is the procedure for repairing a bathroom if you need to install lighting or sockets for appliances?

First of all, you need to purchase all the materials necessary for installation:

  • electrical cable;
  • corrugation and junction box;
  • connection terminals;
  • sockets, switches;
  • lamps, etc.

The cable should be used with a double insulating layer. It must be placed in a protective corrugation (metal or plastic). Often rash and quick repairs in the bathroom involve external wiring, but this is best avoided - the closer the cable is to external environment, the greater the risk of a short circuit. The best option is hidden wiring, which involves shaving the walls.

When connecting wires, special terminals should be used. It is also desirable to carefully isolate all connections with electrical tape. All key nodes should be located in an accessible place and placed in special plastic cases.

It should be noted that not all lamps are suitable for placement in the bathroom, but only with a moisture protection index (IP) of 3 and higher. This will ensure that moisture does not get into the devices, which can cause a short circuit.

Stage 6. Finishing work

After the work on all communications is completed, the comprehensive renovation of the bathroom proceeds to the next stage - finishing. This stage involves the alignment of the walls and the further laying of tiles.

To make a bathroom renovation, you need to go through two stages of finishing:

  • starting;
  • finishing.

The starting one involves applying the main layer from a special mortar. It has high tenacity and easily connects to the surface. The starting layer made is quite thick and is up to 250 mm. It is applied gradually, in two stages. This allows for better alignment.

Lastly, a finishing layer is applied, making the surface of the wall even more even. After that, you can easily move on to finishing ceramic tiles. It is laid on the level, both on the floor and on the walls with the help of special cruciform beacons and fixed with a special adhesive.

The ceiling in the bathroom is better to make a stretch - this best option both in terms of price and waterproofing properties. If you need a bathroom refurbishment, this option can also be taken into account. Mounting stretch ceiling very simple and refreshing appearance rooms.

Stage 7. Installation of the ventilation system and installation of equipment

Many people are interested in how to repair the bathroom, but they pay more attention directly to the finishing and installation of communications, forgetting about the ventilation system. Meanwhile, its presence and proper functioning can significantly extend the life of the repair. And in general, how can you make repairs in the bathroom and not think about ventilation?

How to make the bath well ventilated, avoiding the formation of excessive condensate? To do this, it is necessary to leave space for natural and artificial ventilation in the room. Each bathroom has a special hole in the wall that has access to a common ventilation system Houses. When carrying out finishing, you need to remember this and not close it. In the future, a special grate is installed in this place, which is equipped with a grid - it retains small particles, but does not interfere with air circulation.

For rooms with weak natural ventilation a special fan may be required. With its help, unnecessary steam will be forcibly removed from the bathroom. Most often, bathrooms provide combined air exchange, when the repair allows you to install your own fan and additionally use a natural outlet. This solves the problem of how to make the bath well ventilated.

In general, repairs carried out inside the bathroom must be carried out in accordance with all quality and safety requirements. There are certain stages of bathroom renovation that require consistent execution. Only if a certain sequence is observed during the installation of communications and finishing, construction work will be carried out quickly and will cause zero problems when using the premises.

Features of bathroom renovation involve the use of only high-quality materials that are resistant to high temperatures and moisture. Otherwise, there is a risk of their premature deterioration, as well as the development of fungi and molds that are dangerous to human health.

Bathroom remodeling is a multi-faceted process, and many don't know where to start. Indeed, if you approach this issue without preparation, you can end up in difficult situation. However, when using all the above tips, making a bath with your own hands is not difficult.

In order for your repair, once started, not to become an endless nightmare for you, you need to organize such a serious event as correctly as possible. So let's develop step by step plan actions that will help us start and, most importantly, complete the repair in a reasonable time.

Budgeting

Do not forget that bathroom renovations are quite expensive. Therefore, a preliminary budgeting will be very useful. Initially think over the design of your bathroom, determine everything that you would like to place there. Decide if you are ready to completely change the plumbing or it is quite possible to do so simple trick like bathroom renovations. Moreover, if you can do some (and maybe all) of the work yourself, without involving builders, this will help save about 50% of the cost of the entire estimate.

Preparatory work

If you have decided to overhaul bathroom, then you need to get rid of the old plumbing. Then you can begin to dismantle the old finishing materials. Be sure to pay attention to the condition of the sewerage and water pipes and, if necessary, carry out a complete replacement of pipes.

If state plumbing equipment and pipes are satisfactory and do not require complete dismantling, then it will be enough for you to carry out such a procedure as restoring baths. This can significantly reduce the time and cost of repairs.

Bathroom cladding

First you need to prepare the walls and floor for laying tiles. The surface must be smooth and even, only then the tile will look good. After leveling the surfaces, do not forget about waterproofing, which can cover the floor and walls where necessary.

The choice of tiles for wall and floor cladding in the bathroom is huge. Material - ceramics or porcelain stoneware, and color and size - a matter of your taste. After laying the tiles, grouting is required, which can also be matched to any color.

The ceiling in the bathroom can be painted, or plastic can be used to finish it. In addition, an excellent choice for a room with high humidity is a stretch ceiling.

Filling the bathroom

Now you can fill the bathroom with everything you need and, first of all, this is of course plumbing. Please note that if you are going to install cast iron or steel bath, then this should be done before tiling. Same items as acrylic bath, shower, sink, toilet, are already installed in a fully prepared room. Enameling of baths (if you decide to leave old bath) is also carried out after all dirty work.

Then install and connect washing machine, we place all kinds of lockers, shelves, mirrors, various accessories. And enjoy your new bathroom!

If you decide to do your own bathroom renovation, then this review will tell you correct sequence actions. Choose the most suitable option work and implement it as recommended in the corresponding section of the article.

How to organize work

To cope with the work, you need to carefully plan each stage.

The more you understand each stage, the easier it will be to work:

  • Thinking through the future interior and choosing plumbing;
  • Dismantling of old finishes and equipment;
  • Laying communications;
  • Floor finishing;
  • Wall decoration;
  • Ceiling finish.

Interior planning

Before starting work, you need to decide on a number of factors and plan for repairs.

At this stage, the following aspects should be considered:

  • The size of the room - the design directly depends on this. If the room is small, then it comes to the fore rational use space. And if there is enough space, then you can embody any ideas that you would like to see;

  • Next, you need to choose the arrangement of plumbing and furniture elements. You don't have to be a designer here, the internet is full of examples that you can use. And you can take turnkey solution, or you can make your own version based on one or more examples to take into account all the features of your bathroom;

  • Consideration should be given to whether replacement of plumbing and sewer pipes. Also decide in advance whether the plumbing will be replaced, as this greatly increases the cost of the project. If the replacement will be made, then decide in advance on the specific options for the equipment in order to know its dimensions, colors and connection method;

  • Very important aspect- planned budget. If you need to carry out repairs quickly and inexpensively, then you should choose cheap and easy-to-install materials. And vice versa, if it is important for you to get the best result and the question of price is not worth it, then you can choose expensive finishing materials;
  • Be sure to measure the area of ​​​​all surfaces, this will allow you to accurately calculate the finishing materials.

Dismantling of old finishes and equipment

This part of the work very often takes longer than the finishing itself. After all, knocking down a tile is much more difficult than laying a new one, the same goes for removing paint and dismantling plumbing.

Let's look at the most common types of work:

  • The floor is mostly tiled. The easiest way to remove it is with a perforator with a flat blade. The process is noisy and not always easy, especially if the ceramic is held firmly and does not come off entirely, but in pieces. It is much easier if you have linoleum: you just need to remove the plinth and tear off or simply remove the material from the surface;

  • As for the ceilings, there is most often whitewash or. The first option must be removed with a spatula, pre-soaking the surface. The second one must be looked at according to the situation and either special compositions, or heating with a hairdryer, or mechanical processing should be used;

  • As for the walls, they most often have tiles or many layers. oil paint. The first type of coating is knocked down with a puncher or a hammer with a chisel. The second is best removed with special composition, which is called a paint remover. The wash is applied to the surface and left for certain time, after which the paint easily moves away from the wall, if necessary, individual sections are processed again;

  • Dismantling of plumbing is carried out according to the situation. Often the sides of the bathroom and its supports are concreted, so you need to free the structure with a puncher. If the structure is very heavy and take it out of small room problematic, then you can cut it into two parts with a grinder. This will make your job easier.

Laying new communications

If, after dismantling the old equipment, you found terrible metal water pipes and cast iron sewer elements, it is better to replace them.

The work is done in the following order:

  • First you need to dismantle all the old pipes. Sewer communications are disconnected at the joints, and water pipes are cut off in front of the tap, which shuts off the water supply;

  • To hide water pipes, it is better to lay them in strobes. Strobes are made in the walls using a perforator according to the size of the pipelines. It is important to mark the location of the grooves in advance so that you are not distracted during the work;

  • Sewerage is made from plastic pipes. Thanks to the connections with special seals, you can easily assemble the system yourself, and it will take a little time. All turns and branches are made using special corners and bends;

  • As for the water supply, it is best to lay polypropylene pipes, which are connected with a special soldering iron. If you do not have such equipment, then you can involve a specialist. In the bathroom, the scope of work is small, and the price for the services will not be very large;

Floor covering

If you are doing repairs in the bathroom with your own hands, then you should start from the floor. We will analyze two options for the work: laying linoleum and laying tiles. But first of all, you need to prepare the surface.

The process goes like this:

  • The floor is cleaned of dust and debris, if it has large irregularities, cracks and damage, then it is best to repair them cement mortar. A ready-made dry mixture is bought, diluted with water and applied to the required areas;
  • The final leveling of the floor is easiest to do with a self-leveling compound. It is prepared and poured onto the surface, after which it is evenly distributed using a spiked roller or spatula. It is important to level the plane so that the base is even and smooth, this will simplify further work.

If you decide to make a warm floor, then it is better to fill the surface after laying pipes or heating modules. Then you do not have to do the screed twice. The process here looks like this: first, the heating system is laid (this process is described in a separate review), after which the solution is poured in such a way that its thickness above the pipes is at least 2 cm.

Now let's analyze the most fast option bathroom floor renovation

  • Linoleum is purchased, and it is worth choosing options without a base or on a polymer foam base, which is not afraid of moisture. It is very important to buy a piece of such a size that you cover the entire surface without seams. The material may have a large width, so there will be no problems with the choice;

  • The material is spread on the floor, after which it is leveled on the surface. All excess is carefully cut off with a knife at the junction of the wall and floor. The work is simple, but requires care so as not to spoil the material. It is best to cut with a sharp knife with a hard blade;

  • Since the room is small, it is not necessary to glue the material. It is much easier to glue around the perimeter of the paint Double-sided tape and fix linoleum on it. Everything is very simple and at the same time very reliable.

Now let's look at a more reliable option - tiles, which are not only attractive, but also durable.

In this case, the work is done in this way:

  • getting ready necessary materials. In addition to the ceramics itself, we need an adhesive composition and a fugue for grouting;

  • Of the tool needed building level, notched trowel, mixer and a container for preparing the solution. Also, you can not do without a tile cutter, since in any case you will have to cut some elements. Crosses will help to make all the seams between the tiles perfectly even and neat;

  • You can start both from the middle of the room and from the corner of the room. An adhesive composition is applied to the floor, which is leveled with a notched trowel or trowel. One or more tiles are laid, after which their position is adjusted and checked using a level. If necessary, individual sections can be slightly knocked out by hand, usually they sit down without problems;

  • The laying continues like this. It is important to check the level of both each individual element and the entire surface as a whole. Put the level in all directions, so that if there are problems, they can be detected and eliminated in a timely manner;

  • After laying the tiles on the floor, you need to wait for the glue to dry, usually it takes a day. Then the grout composition is prepared and applied to all cracks. The work is done with a rubber spatula, you must fill the voids between the tiles to protect the surface from moisture. After the grout has dried, remove its remains from the surface and wash the tiles.

Working with walls

As for this part of the room, here we will also analyze two options: PVC panels and tiles. If you need inexpensive option, then the walls must be unambiguously sheathed with plastic panels.

The work instructions look like this:

  • First you need to prepare the walls. If they have large irregularities or cracks, then they should be repaired with cement mortar. Foci of mold must be treated with special fungicidal compounds;
  • For work, we need PVC panels and accessories for them, as well as wooden block for framing and fasteners. From the tool you need a level, a hacksaw, a screwdriver and a puncher, as well as a tape measure and a pencil for measuring and marking;

  • Wall decoration begins with the construction of the frame, for this, first marking is done by level in order to determine the plane of the future frame. Next, the bar is cut into pieces of the required size, and holes for dowels are drilled in it every 50 cm;
  • Marks are made on the walls, holes are drilled, and the bar is attached to the dowels, but is not fixed. With the help of a level, the plane of the crate is set, slats and chips are placed under it, after which the screws are hammered;

If you have a riser in your bathroom, then it is also better to sew it up. To do this, a crate is constructed around the pipe.

  • Attaching the panels is easy. Placed in a corner start profile or corner, after which the first element is inserted. It is located with a ledge forward to secure it with screws or a stapler in the back. The work is simple and takes little time, the main thing is to join the elements well before fixing;

  • If you did not immediately fasten the additional elements, then after installing the panels, you need to glue the corners and other components on liquid nails. This will quickly close all the flaws and give the repair a neat look.

The second option for finishing the walls in the bathroom is laying ceramic tiles.

The process is almost the same as for flooring, but it has its own characteristics, which we will consider here:

  • First of all, a rail or metal is fixed along the perimeter at the height of one tile. The masonry will start from this element, this will ensure a perfectly flat plane of the wall, even if there are flaws on the floor. The work is simple: glue is applied to the surface, after which the tiles are glued. Do not forget to put crosses in the seams and check the plane with a level;

  • The next day, the slats are removed and the first row can be reported. If necessary, the elements are trimmed, and we get flat wall from bottom to top;

  • The final stage is grouting with a fugue. It is important to fill all the seams so that water does not get under the surface.

Ceiling finish

Now let's figure out how to repair the ceiling. There are three options here if you need cheap repair, then the easiest way is to use plastic panels (the technology is the same as in the section above).

If you want to get a reliable and attractive ceiling, then you can order stretch fabric. Another inexpensive option is surface putty, which we will analyze.

The technology of work is simple:

  • From the materials you need putty for wet rooms, a primer deep penetration and paint of a certain color;

  • From the tool you need a brush for paint and soil (or a roller), a wide and narrow spatula, a grinding grater with sandpaper;
  • Work begins with cleaning the surface from dirt and dust. If there are seams on it, then they need to be sealed with a special mortar for joints. concrete slabs. Foci of mold are treated with an antiseptic;
  • The ceiling is treated with a primer, this allows you to strengthen the surface and improve the adhesion of the putty composition. For concrete, a single treatment is sufficient. Work can be continued only after the surface has completely dried;

  • Putty is made in two layers. The first is needed in order to eliminate all minor irregularities and apply a more or less uniform layer of putty to the entire surface. The second is the final alignment, and all the flaws of the first layer are eliminated. The work is simple: the spatula is held at an angle of 30 degrees, and the mass is distributed over the ceiling in an even layer;

  • After the surface has dried, it must be leveled. For this, a grater with sandpaper or an abrasive mesh with a grain size of P150 or less is used. The ceiling is processed in parts to remove all the flaws of the putty and make the plane perfectly smooth;

To check how well you leveled the ceiling, just hold a light bulb or flashlight up to it. The light will show all the flaws, if any.

  • After leveling, dust is removed from the surface. Then a primer is applied to it to strengthen the putty layer;
  • The last step is staining. Use washable paint to make the ceiling easier to care for and not afraid of moisture. Most often, staining is done in 2 layers.

    I am sure that after reading the article, you will already choose the repair option and implement it in the near future. The video in this article will help to better understand some of the works described above. If you have any questions, then write them in the comments below.

If you decide to do your own bathroom renovation, it is important to know the sequence of bathroom renovation. One step must follow the other, because the violation of the order of operations leads to errors that appear during operation.

Training

Before proceeding with the repair in the bathroom, you need to determine the scope of work and roughly calculate the costs that await you. The easiest way is to make a list of questions. By answering them, you will have an idea of ​​the work that is needed. Here is a sample list of questions:


Only after you answer these questions, you can roughly estimate how much the repair will cost you. But this is without finishing materials.

Choice of finishes

The next stage of the bathroom renovation is the choice of finishing materials. The most common option is tiles on the walls and on the floor. This finishing method is popular as it is durable and easy to clean. But the cost of such finishing is high. There are cheaper options, but no less interesting. For example, on the floor you can or. Walls can be painted, pasted over with special wallpaper,.

Not fewer options for decorating the ceiling. The standard way of finishing is a bleached or painted ceiling. But recently, suspension or tension systems have become more popular. They allow you to hide communications, although they take a few centimeters in height. Ceilings in the bathroom can be:


Depending on the type of ceiling, the sequence of repairs in the bathroom changes. When choosing a stretch ceiling, it is done last. After everyone else Finishing work Finished, doors installed. The plasterboard ceiling, as well as bleached or painted plaster, is finished simultaneously with the walls or a little earlier - so that whitewash or paint does not fall on the walls. Suspension systems (except drywall) are assembled after finishing the walls.

Drawing up a plan and procedure

After you have decided on all these issues, have chosen plumbing and finishing materials, you begin to draw up a plan. After all is removed old finish, with an accuracy of up to a centimeter, measure the dimensions of the room, transfer the dimensions to the plan. On this plan, all communications are drawn, distances to all points of their exit are drawn, plumbing and furniture are drawn on a scale. After all, the location of the outlets of the water supply, sewerage depends on the position of the plumbing and its size. The following is the work plan:


This is a step by step bathroom renovation plan. There is only one caveat: when to install doors. Usually door frame put after they prepare the walls for decoration. In this case, the wall decoration will fit close to the box. This is important if platbands are not provided from the inside. Door leaf you can hang it later - after the end of all the "dirty" work or immediately, but protect it with a tight plastic wrap. Otherwise, it is desirable to follow the sequence of repairs in the bathroom without changes.

The bathroom is a room with special conditions: high humidity, temperature changes. Therefore, when starting a bathroom renovation, you should clearly plan the entire workflow, think over the sequence of steps to be performed. In this article, you will learn how to start a bathroom renovation and what types of work you need to do yourself.

Step-by-step instructions for renovation in the bathroom

Stage 1: drawing up a plan and choosing a design solution.

There are two types of bathroom renovations:

  • unplanned, spontaneous, arose by the will of unforeseen circumstances. For example, when a pipe breaks, flooding by neighbors.
  • planned, which is cosmetic or capital. It requires planning, serious investments and time.

It is worth starting repairs in the bathroom with a definition of design, interior. Think over to the smallest detail what this room will be like, choose a color. are considered traditional pastel shades, as well as a combination of blue with blue or peach with beige.

The next moment is a choice facing material. As a rule, finishing in the bathroom is performed tiles, ceramic granite, mosaic, plastic panels. Check plumbing to see if it needs to be replaced. Select the appropriate option if necessary. Let's move on to measuring work: we measure all sides, calculate the area of ​​\u200b\u200bthe room. Based on these data, we mark the location of the plumbing.

Stage 2: selection of plumbing fixtures and finishing materials.

It is important to understand for yourself that the purchase of plumbing is preceded by the planning stage, and not vice versa. This means that first we develop a design project, draw up a plan, and only then we go to the store. Another point - you should clarify the dimensions of the plumbing you like and check with the plan whether it will fit.

As for finishing materials, it is preferable to purchase them immediately for the entire repair cycle, so as not to be distracted later, if suddenly something was not enough. Do not forget about the preparation of the necessary tools.

Stage 3: dismantling of plumbing and cladding.

After everything preliminary work completed, proceed to the beginning of the workflow:

  • we take out the sink and bathtub from the room, even if they will not be replaced with new ones. So, you can keep them safe and clean.
  • filming old tile, cleaning after it all surfaces: ceiling, walls, floor.
  • remove from walls old paint if they were previously painted, as the adhesive solution or a new layer of paint will not adhere well to the surface.

Stage 4: replacement of communications: pipes, electrical wiring.

Very often, in an old house, you should carefully inspect and replace not only the pipes that are in the bathroom itself, but also the main riser, and sometimes interfloor pipes. Why is it worth doing it? Old pipes can leak at any time, and then the new repair will be damaged, and additional investment will be required to eliminate defects.

The next step is the replacement of wires, switches, installation of new sockets in conveniently located places. Important point this stage - the installation of a ventilation system, it is preferable to make it forced. Construction market offers different types fans for forced ventilation.

Watch the video: Do-it-yourself bathroom renovation, where to start

Stage 5: leveling surfaces.

At this stage, we focus on the condition of the surfaces. uneven walls will need to be leveled using special plaster mixes. First you will need to putty all defects in the form of cracks, potholes. In pretty difficult situations it will be necessary to apply several leveling layers of plaster.

Stage 6: surface finishing.

After all surfaces are leveled and dried, you can proceed to the finishing work: painting, tiling, coating.

An excellent option for decorating the ceiling is coating with emulsion paint. Moisture will not accumulate on such a surface, moreover, you can easily choose the desired color. practical solution- usage plastic panels or stretch ceiling.

Stage 7: plumbing installation.

We install plumbing fixtures in their places, having completed all the finishing work. In this case, the entire space will be available for lining, and what is important - the plumbing will not be damaged or dirty.

Stage 8: finishing touches.

We place furniture, accessories: a mirror, hooks, lamps. If necessary, we will replace the door. Previously, this should not be done, since you can scratch, damage the surface of the canvas at the time of entering the plumbing or during its installation.

Such is the sequence of repair work in the bathroom, which meets the principles of practicality, rationalization. Moreover, you can do all this workflow yourself, and the result will be a sparkling, impeccable cleanliness, attractive bathroom design.

Also read: quick and inexpensive do-it-yourself home repairs

Now you know where to start repairing the bathroom and how to complete all the stages of work. You can use the services of specialists, but it is much cheaper to do everything yourself. beautiful bath- the dream of every person, because it is from this room that your morning begins. Watch video and read step by step instructions to learn how to repair work on one's own.