What is included in a home renovation? What is the difference between a major overhaul and a current one? Concepts and definitions of what types of work relate to these types of repairs

In accordance with federal law"On the overhaul of apartment buildings", the owners are obliged to independently pay for the overhaul of the entire house. And the regional authorities must ensure the timely execution of all the work envisaged.

This law also provides for the types repair work and a list of premises apartment building in which they are to be carried out.

Dear reader! Our articles talk about typical ways to resolve legal issues, but each case is unique.

If you want to know how to solve exactly your problem - contact the online consultant form on the right or call by phone.

It's fast and free!

Major house renovation- this is the replacement or restoration of house structures or their elements. That is, as part of the overhaul, those areas of operation that are obsolete or may cause the destruction of the building should be reconstructed or replaced with new ones.

What is included in the overhaul of an apartment building:

  1. Facade and foundation works.
  2. Replacement of engineering and technical communications.
  3. Elevator repair.
  4. Roofing and basement works.
  5. Installation of common house meters.
  6. Installation of ventilation systems.
  7. Repair inside the entrance.

Law on the overhaul of apartment buildings

In fact, new law delimited the duties and responsibilities for the overhaul of apartment buildings between the owners and the regional authorities. At the same time, the regional authorities are given an organizing and controlling function, and the owners are given the collection of funds to pay for repairs.

With the entry into force of the law, all subjects of the federation were obliged to prepare as soon as possible normative documentation in accordance with the overhaul program.

Each subject of the Russian Federation is obliged:

  1. Develop and adopt a regional list of works included in the overhaul of the house, determine and set their deadlines.
  2. Determine a regional operator (a fund in which capital repairs will be accumulated and from which funds will be used).
  3. Adopt documents establishing the procedure for work, the minimum amount of contributions, appoint a body to control the performance of work and spending money.

In turn, the owners of multi-apartment property hold a meeting at which they determine where the money transferred by them for major repairs will be stored.

According to the law, the owners can choose the bank to which they entrust their funds or transfer them to the fund of the regional operator.

If the owners cannot independently determine the form of keeping money, then this decision is made by the municipal authority for them.

Who pays?

Before the law came into force, repair work on the structures of apartment buildings was paid for from the Housing and Utilities Reform Fund. Now this fund is responsible only for the resettlement of tenants from the dilapidated and emergency fund.

The payment for the overhaul is assigned to the owners of square meters in apartment buildings. Payment for overhaul is a mandatory item in the monthly payment for housing and communal services, its amount is determined individually in each region.

Tenants are exempted from contributions to overhaul:

  1. emergency houses.
  2. Houses, the land under which it is customary to withdraw in favor of the state.
  3. The apartments are in municipal ownership.

The amount of the monthly contribution for the overhaul of an apartment building is calculated based on the average income in the region. On average in the country it is 6-7 rubles. for every square meter property. Contributions may differ in different categories of housing located in the same region.

Residents who are not owners, that is, they live in non-privatized apartments under a social tenancy agreement, do not have the right to participate in organizational meetings, namely, they cannot make proposals for major repairs and vote.

Another one important detail If some of the owners of an apartment building do not systematically pay contributions for major repairs, this does not relieve them of responsibility. In no case can the missing amount be taken from the funds of respectable residents, but can be recovered in court according to the law.

When is it done?

In order for the house to be overhauled, it is first necessary to decide what type of work is needed and what was the reason for the overhaul.

In some cases, it may turn out that the building needs current repairs, and not capital repairs, which significantly changes the timing of its implementation and financing:

  1. Resident initiative. To carry out a major overhaul of the house at the initiative of the tenants, you need to convene a meeting of owners. During the meeting, determine what kind of work needs to be done in the house and vote. If more than 2/3 of the owners vote for the overhaul, then a protocol is drawn up with detailed requirements for the proposed work. The protocol is transferred to the Management Company, which will coordinate it with the housing inspection. The last instance appoints terms of repair and makes calculation of its cost. If the housing inspection does not agree with the need for a major overhaul or agrees to a limited type of work, an independent examination can be ordered to confirm the validity of the overhaul. Examination is done for a fee.
  2. Emergency situation. It may happen that no major repairs were planned in the house, but their need arose due to an accident. An accident in the understanding of the Management Company is a breakthrough of water supply, sewerage or heating pipes with fluid leaking out. Work to eliminate the causes of the accident and replace broken pipelines is carried out at the expense of capital repairs in the shortest possible time. That is, if a riser with a hot or cold water, it should be replaced immediately, and not repaired by applying numerous clamps.
  3. Scheduled repairs. Scheduled or current repairs are a separate line of household expenses. The line "current repairs" is indicated in the bills for housing and communal services, and residents pay their money on it. Therefore, the current repair does not belong to the capital one and is carried out according to the plan, depending on the wear of the structures or elements of the building. Scheduled repairs include such works as cleaning pipes, replacing staples, stairs, railings, doors, broken glass, maintenance of building fittings, and cosmetic repairs.

Differences of the current repair

The main difference between the current repair and the overhaul is the possibility of carrying it out without interrupting the building from operation. That is, if repair work on the DHW pipeline does not require the shutdown of all residents, then the repair is ongoing. The same applies to work on the heating or power supply pipeline.

The current repair of an apartment building is carried out periodically and quite often, in addition, scheduled repairs are less expensive than capital repairs.

It should be remembered that these two types of repairs have different sources financing. Types of work on current and major repairs are specified in the law and are strictly regulated.

Foundation website

Everything related to the overhaul of apartment buildings and not only can be found on the official website of the Fund for Assistance to the Reform of Housing and Public Utilities at http://www.fondgkh.ru/

This is a convenient site that does not require registration, where you can view information such as:

  1. What applications are made to the fund?
  2. Documents, forms and rules for their completion.
  3. Forms for filling out reports.
  4. List of credit institutions of the country where you can open accounts for the overhaul fund.
  5. Detailed information about the materials and technologies of modern renovation of multi-apartment buildings.
  6. Innovations in documentation.

The site constantly publishes housing and communal services news from all regions of the country. In addition, there is a telephone hotline where you can get answers to your questions.

Repair work, as a rule, depending on the frequency of carrying out, is divided into two types: current repair and overhaul.

List of works on overhaul

Lists of types of work on capital repairs are contained in departmental acts (Regulations, Norms and Rules .., Instructions, Recommendations, etc. ..). These lists of types of work vary depending on the type of capital construction object, its purpose.

Types of work are given in annexes to departmental regulations, the texts of which are given in the attachment to this publication:

Appendix 8. List of works on major repairs of buildings and structures ( Decree of the Gosstroy of the USSR of December 29, 1973 N 279 "On approval of the Regulations on the scheduled preventive maintenance of industrial buildings and structures" (together with "MDS 13-14.2000 ..."))

Appendix N 8. An approximate list of works performed during the overhaul of the housing stock ( Decree of the Gosstroy of the Russian Federation of September 27, 2003 N 170 "On the approval of the Rules and Norms technical operation housing stock")

Appendix 9. List of works on the overhaul of buildings and structures ( Order of the Ministry of Justice of Russia dated September 28, 2001 N 276 (as amended on January 24, 2006) "On approval of the instructions for the technical operation of buildings and structures of institutions of the penitentiary system")

Table 2.3. The list of works on the overhaul of apartment buildings to be included in the scope of works financed from the funds provided for by Federal Law N 185-FZ ( )

Definition of the concept of "overhaul" in the NPA

Overhaul- repairs carried out to restore the technical and economic characteristics of the object to values ​​close to the design ones, with the replacement or restoration of any constituent parts (Order of the Gosstroy of the Russian Federation of December 13, 2000 N 285 "On approval of the Standard Instructions for the Technical Operation of Heat Networks of Public Heat Supply Systems").

Overhaul- carrying out a complex of construction works and organizational and technical measures to eliminate physical and moral deterioration, not related to a change in the main technical and economic indicators of the building and its functional purpose, providing for the restoration of its resource with partial replacement, if necessary, of structural elements and systems of engineering equipment, as well as improvement performance indicators ( Decree of the Government of Moscow of July 30, 2002 N 586-PP (as amended on December 23, 2015) "On approval of the Regulations on the unified procedure for pre-project and design preparation for the construction of utilities, facilities and road transport facilities in the city of Moscow").

Capital repairs of capital construction facilities(except for linear objects) - replacement and (or) restoration building structures capital construction facilities or elements of such structures, with the exception of load-bearing building structures, replacement and (or) restoration of engineering and technical support systems and engineering and technical support networks of capital construction objects or their elements, as well as replacement individual elements load-bearing building structures to similar or other elements that improve the performance of such structures and (or) restoration of these elements ( (as amended on 06/18/2017)

Capital repairs of buildings and structures

For the overhaul of buildings and structures include works on the restoration or replacement of individual parts of buildings (structures) or entire structures, parts and engineering equipment due to their physical wear and tear and destruction with more durable and economical ones that improve their performance ( Decree of the Gosstroy of Russia dated 03/05/2004 N 15/1 (as amended on 06/16/2014) "On approval and implementation of the Methodology for determining the cost of construction products on the territory of the Russian Federation" (together with "MDS 81-35.2004 ...")).

Building overhaul- a set of construction and organizational and technical measures to eliminate physical and functional (moral) wear and tear that do not involve changes in the main technical and economic indicators of a building or structure, including, if necessary, the replacement of individual or all structural elements (with the exception of non-replaceable) and engineering systems equipment with their modernization. Capital repairs do not extend the service life of buildings, as it is determined by the most durable elements that are not replaced during repairs ( "Methodological recommendations for the formation of the scope of works for the overhaul of apartment buildings financed from the funds provided for by the Federal Law of July 21, 2007 N 185-FZ "On the Fund for Assistance to the Reform of the Housing and Communal Services" (approved by the State Corporation "Fund for Assistance to the Reform of Housing and Communal Services" 15.02.2013)

Capital repairs of an apartment building

Capital repairs of an apartment building- carrying out and (or) rendering of the works and (or) services provided for by this Federal Law to eliminate malfunctions of worn-out structural elements of the common property of owners of premises in an apartment building (hereinafter referred to as common property in an apartment building), including their restoration or replacement, in in order to improve the performance of common property in an apartment building ( article 2 of the Federal Law of July 21, 2007 N 185-FZ (as amended on June 23, 2016) "On the Fund for Assistance to the Reform of Housing and Communal Services").

Capital repairs of the common property of an apartment building: a set of works (services) for the replacement and (or) restoration (repair) of the bearing and (or) functional capacity of structures, parts, engineering and technical support systems, individual elements of the supporting structures of an apartment building that have lost during operation to similar or other improving indicators up to them regulatory status when the volume of such work exceeds the current repair ( )

Types of overhaul

Comprehensive and selective overhaul

Overhaul is divided into complex overhaul and selective overhaul.
a) is a repair with the replacement of structural elements and engineering equipment and their modernization. It includes work covering the entire building as a whole or its individual sections, in which their physical and functional wear is compensated.
b) is a repair with full or partial replacement of individual structural elements of buildings and structures or equipment, aimed at full compensation for their physical and partially functional wear.
Classification as a major overhaul depends on technical condition buildings scheduled for repair, as well as the quality of their layout and the degree of internal improvement ( "Methodological recommendations for the formation of the scope of works for the overhaul of apartment buildings financed from the funds provided for by the Federal Law of July 21, 2007 N 185-FZ "On the Fund for Assistance to the Reform of the Housing and Communal Services" (approved by the State Corporation "Fund for Assistance to the Reform of Housing and Communal Services" 15.02.2013))

Complete overhaul: replacement, restoration and (or) repair of the common property of an apartment building or its individual parts, carried out in relation to the majority of the common property of an apartment building ( "GOST R 51929-2014. National standard of the Russian Federation. Services of housing and communal services and management of apartment buildings. Terms and definitions" (approved and put into effect by Order of Rosstandart dated 11.06.2014 N 543-st)

Complex overhaul- covers all elements of the building, provides for the simultaneous restoration of all worn-out structural elements, engineering equipment and an increase in the degree of improvement of the building as a whole, eliminates physical and moral deterioration. It is not advisable to carry out the next comprehensive overhaul of a building or structure in cases where it is planned to demolish or transfer buildings or structures in connection with the upcoming construction on the site they occupy of another building or structure, the building is to be reconstructed, the building is planned to be dismantled due to general dilapidation. In these cases, work must be carried out to maintain the structures of the building or structure in a condition that ensures their normal operation during the appropriate period (before demolition or reconstruction) ( )

Overhaul selective: replacement (restoration) of the common property of an apartment building or its individual parts, carried out in relation to a smaller part (some parts) of the common property of an apartment building ( "GOST R 51929-2014. National standard of the Russian Federation. Services of housing and communal services and management of apartment buildings. Terms and definitions" (approved and put into effect by Order of Rosstandart dated 11.06.2014 N 543-st)

Selective overhaul- covers individual structural elements of the building or its engineering equipment, while eliminating the physical wear and tear of individual elements and technical systems of the building. Selective overhaul is carried out in cases where a comprehensive overhaul of a building can cause serious interference in the operation of the facility, with significant wear of individual structures that threaten the safety of other parts of the building, if it is not economically feasible to carry out a comprehensive overhaul according to the restrictions given in the definition of a comprehensive overhaul ( Decree of the Government of Moscow dated September 29, 2010 N 849-PP (as amended on July 7, 2015) "On approval of the Regulations for the overhaul of real estate objects owned by the state of the city of Moscow and transferred to trust management")

Emergency overhaul- repair or replacement of all structural elements, devices, systems of engineering equipment that have failed due to accidents, natural disasters, terrorist attacks and vandalism ( Decree of the Government of Moscow dated September 29, 2010 N 849-PP (as amended on July 7, 2015) "On approval of the Regulations for the overhaul of real estate objects owned by the state of the city of Moscow and transferred to trust management")

Capital repairs of external engineering communications

For the overhaul of external engineering communications and improvement facilities include repair of water supply networks, sewerage, heat and gas supply and electricity supply, landscaping of courtyard areas, repair of paths, driveways and sidewalks, etc. ( Decree of the Gosstroy of Russia dated 03/05/2004 N 15/1 (as amended on 06/16/2014) "On approval and implementation of the Methodology for determining the cost of construction products on the territory of the Russian Federation" (together with "MDS 81-35.2004 ...")

Capital repairs of roads

Capital repairs of the highway- a set of works to replace and (or) restore the structural elements of the highway, road structures and (or) their parts, the implementation of which is carried out within the established permissible values ​​and specifications the class and category of the motor road, and the implementation of which affects the design and other characteristics of the reliability and safety of the motor road and does not change the boundaries of the right of way of the motor road ( Art. 3 of the Federal Law of November 8, 2007 N 257-FZ (as amended on February 7, 2017) "On highways and road activities in the Russian Federation and on amendments to certain legislative acts of the Russian Federation")

Overhaul pavement - a set of works in which the complete restoration and improvement of the performance of pavement and pavement, subgrade and road structures is carried out, worn-out structures and parts are replaced or replaced with the most durable and durable, increasing the geometric parameters of the road, taking into account the increase in traffic intensity and axial loads vehicles within the limits corresponding to the category established for the road being repaired, without increasing the width of the subgrade along the main length of the road ( Order of the Ministry of Housing and Public Utilities of the Moscow Region of June 29, 2015 N 125-RV "On Approval of the Rules for the Improvement of the Territory of the Balashikha Urban District of the Moscow Region")

Period of overhaul. Reasonable time

The terms for the overhaul are either established by the parties, or established by regulatory legal acts (NLA). In the absence of an indication of the timing of the repair in the contract or regulation, it is carried out within a reasonable time.

The concept of "reasonable time" is traditional for civil law and is mentioned repeatedly in the norms of the Civil Code of the Russian Federation (see Article 314 of the Civil Code of the Russian Federation, in relation to pledge relations - clause 4 of Article 345, clause 1 of Article 358 of the Civil Code of the Russian Federation).

A reasonable period for carrying out a major overhaul depends on the condition of the property, its properties, climate characteristics, features of the major overhaul, technical capabilities and other reasons.

In addition, the regulatory legal acts can provide both specific terms for the repair, and the procedure for their determination can be fixed, the frequency of implementation certain types repair work.

Investments:

; Appendix 8 to the Decree of the USSR Gosstroy of December 29, 1973 N 279 "On approval of the Regulations on the conduct of scheduled preventive maintenance of industrial buildings and structures" (together with "MDS 13-14.2000 ...")

Appendix 8

SCROLL
WORKS ON CAPITAL REPAIRS OF BUILDINGS AND STRUCTURES

A. BY BUILDINGS

I. Foundations

1. Changing wooden chairs or replacing them with stone or concrete pillars.
2. Partial re-laying (up to 10%), as well as strengthening of stone foundations and basement walls, not associated with the superstructure of the building or additional loads from newly installed equipment.
3. Restoration of vertical and horizontal insulation of foundations.
4. Restoration of the existing blind area around the building (more than 20% total area blind areas).
5. Repair of existing drains around the building.
6. Change of single collapsing stone and concrete pillars.

II. Walls and columns

1. Sealing cracks in brick or stone walls with clearing furrows, with bandaging of seams with old masonry.
2. Installation and repair of structures that reinforce stone walls.
3. Re-laying of dilapidated brick cornices, lintels of pit parapets and protruding parts of walls.
4. Relocation and repair of individual dilapidated sections of stone walls up to 20% of the total volume of masonry, not related to the superstructure of the building or additional loads from newly installed equipment.
5. Strengthening of reinforced concrete and stone columns with clips.
6. Repair and partial replacement (up to 20% of the total volume) of columns that are not associated with additional loads from newly installed equipment.
7. Change of aggregates in walls with stone, reinforced concrete and metal frames (up to 40%).
8. Change of dilapidated crowns of log or block walls (up to 20% of the total surface of the walls).
9. Continuous caulking of log or block walls.
10. Partial replacement of sheathing, backfilling and slab heaters of frame walls (up to 50% of the total wall area).
11. Change or repair of sheathing and insulation of wooden plinths.
12. Repair of stone plinths wooden walls with their transfer up to 50% of the total volume.
13. Setting up again and changing worn clamps of log and block walls.

III. Partitions

1. Repair, change and replacement of worn-out partitions with more advanced designs of all types of partitions.
2. During the overhaul of partitions, partial redevelopment is allowed with an increase in the total area of ​​the partitions by no more than 20%.

IV. Roofs and coverings

1. Replacing dilapidated wooden roof trusses or replacing them with prefabricated reinforced concrete.
2. Complete or partial replacement of dilapidated metal and reinforced concrete trusses, as well as replacement of metal trusses with prefabricated reinforced concrete trusses.
3. Reinforcement of trusses when replacing types of coating (replacing wood slabs with precast concrete, cold coating - with warm, etc.), during suspension lifting devices, as well as during corrosion of nodes and other elements of metal and prefabricated reinforced concrete trusses.
4. Partial or complete change of rafters, mauerlats and battens.
5. Repair of supporting structures of skylights.
6. Repair of devices for opening the covers of skylights.
7. Partial or complete replacement of dilapidated elements of coatings, as well as replacing them with more progressive and durable ones.
8. Partial (over 10% of the total roof area) or complete change or replacement of all types of roofing.
9. Reconstruction of roofs in connection with the replacement of the roofing material.
10. Partial or complete replacement of wall gutters, slopes and covers of chimneys and other protruding devices above the roof.

V. Interfloor ceilings and floors

1. Repair or change of floors.
2. Replacing individual structures or ceilings as a whole with more progressive and durable structures.
3. Strengthening of all types of interfloor and attic floors.
4. Partial (more than 10% of the total floor area in the building) or complete replacement of all types of floors and their bases.
5. Reconstruction of floors during repairs with replacement with stronger and more durable materials. At the same time, the type of floors must comply with the requirements of norms and technical conditions for new construction.

VI. Windows, doors and gates

1. Complete replacement of dilapidated window and door blocks, as well as gates of industrial buildings.

VII. Stairs and porches

1. Partial or complete change of landings, ramps and porches.
2. Change and strengthening of all types of stairs and their individual elements.

VIII. Internal plastering, facing
and painting work

1. Renewal of plastering of all premises and repair of plastering in the amount of more than 10% of the total plastered surface.
2. Change of wall cladding in the amount of more than 10% of the total area of ​​clad surfaces.
3. Continuous anti-corrosion painting of metal structures.

IX. facades

1. Repair and renewal of lining with an area of ​​more than 10% of the lined surface.
2. Full or partial (more than 10%) renewal of the plaster.
3. Complete renewal of rods, cornices, belts, sandriks, etc.
4. Renewal of stucco details.
5. Continuous coloring with stable compositions.
6. Cleaning the facade with sandblasters.
7. Change balcony slabs and fences.
8. Change of coatings of the protruding parts of the building.

1. Complete refurbishment of all types of heating furnaces, chimneys and their foundations.
2. Re-equipment of furnaces for burning coal and gas in them.
3. Complete refurbishment of kitchen stoves.

XI. Central heating

1. Change of individual sections and assemblies of heating boilers, boilers, boiler units or complete replacement of boiler units (in the event that the boiler unit is not an independent inventory object).
2. Repair and replacement of expanders, steam traps and other network equipment.
3. Repair and re-laying of foundations for boilers.
4. Automation of boiler rooms.
5. Transfer from stove heating to central heating.
6. Change of heating registers.
7. Connection of buildings to heating networks (with a distance from the building to the network of no more than 100 m).

XII. Ventilation

1. Partial or complete change of air ducts.
2. Change fans.
3. Rewinding or changing electric motors.
4. Change of gates, deflectors, throttle valves, blinds.
5. Partial or complete change of ventilation ducts.
6. Change of heaters.
7. Change of heating units.
8. Change filters.
9. Change of cyclones.
10. Change of individual chamber designs.

XIII. Water supply and sewerage

1. Partial or complete change of piping inside the building, including water supply inlets and sewer outlets.

XIV. Hot water supply

1. Change of coils and boilers.
2. Change of the pipeline, parts and, in general, pumping units, tanks and pipeline insulation.

XV. Electrical lighting and communications

1. Change of worn-out sections of the network (more than 10%).
2. Change of safety shields.
3. Repair or restoration of cable channels.
4. During the overhaul of the network, it is allowed to replace lamps with other types (ordinary ones with fluorescent ones).

B. BY FACILITIES

XVI. Water supply and sewerage facilities

a) Pipelines and network fittings

1. Partial or complete replacement of anti-corrosion insulation of the pipeline.
2. Change of individual pipeline sections (due to pipe wear) without changing the pipe diameter. At the same time, it is allowed to replace cast-iron pipes with steel pipes, ceramic pipes with concrete or reinforced concrete pipes and vice versa, but it is not allowed to replace asbestos-cement pipes with metal pipes (except in emergency cases).

3. Change of worn fittings, valves, fire hydrants, air vents, valves, standpipes or their repair with the replacement of worn parts.
4. Change of individual siphon pipes.

b) Wells

1. Repair of cell wells.
2. Change hatches.
3. Stuffing new trays to replace the destroyed ones.
4. Replacement of worn-out wooden wells.
5. Renewal of plaster.

c) Water intakes and hydraulic structures

1. Dams, dams, spillways, canals

1. Change or replacement of fastening of banks or slopes in the amount of up to 50%.
2. Filling up swollen slopes of earthworks.
3. Change of clothes.
4. Renewal of the protective layer in the underwater parts of reinforced concrete structures.
5. Change of lattices and grids.
6. Repair and replacement of shield gates.

2. Water wells

1. Construction and dismantling of an oil rig or installation and dismantling of an inventory drilling rig.
2. Cleaning the well from collapses and siltation.
3. Removing and installing a new filter.
4. Fixing the well with a new column of casing pipes.
5. Replacement of water and air pipes.
6. Restoration of well flow rate by torpedoing or flushing with hydrochloric acid.
7. Cementation annulus and drilling of cement.

d) Treatment facilities

1. Repair and replacement of fully waterproofing.
2. Repair and renewal of plaster and ironwork.
3. Relaying brick walls and partitions up to 20% of the total volume of masonry in the building.
4. Sealing leaks in reinforced concrete, concrete and stone walls and bottoms of structures with concrete dismantling in separate places and concrete again.
5. Continuous gunning of the walls of structures.
6. Repair of drainage around structures.
7. Replacement of tank hatches.
8. Replacement of gratings.
9. Replacement of loading filters, biofilters, air filters.
10. Change of filter plates.
11. Replacement of pipelines and fittings.
12. Relaying the drainage system of the silt pads.

XVII. Heat supply

a) Channels and cameras

1. Partial or complete change of coatings of channels and chambers.
2. Partial or complete change of waterproofing of channels and chambers.
3. Partial re-laying of the walls of brick channels and chambers (up to 20% of the total surface of the walls).
4. Partial relocation of drainage systems.
5. Repair of the bottoms of channels and chambers.
6. Renewal of the protective layer in reinforced concrete structures channels and cameras.
7. Change hatches.

b) Pipelines and fittings

1. Partial or complete change of thermal insulation of the pipeline.
2. Renewal of pipeline waterproofing.
3. Change of individual sections of the pipeline (due to pipe wear) without increasing the diameter of the pipes.
4. Change of fittings, valves, compensators or their repair with the replacement of worn parts.
5. Replacement of movable and fixed supports.

XVIII. Access and internal railway tracks

a) ground bed

1. Broadening of the subgrade in places of insufficient width to normal sizes.
2. Treatment of subgrade in places of landslides, erosion, landslides, abysses.
3. Restoration of all drainage and drainage devices.
4. Restoration of all protective and fortifying structures of the subgrade (sodding, paving, retaining walls).
5. Restoration of regulatory structures.
6. Correction, filling up the cones of bridges.
7. Change of individual structures of artificial structures or their replacement with other structures, as well as a complete change of pipes and small bridges (if they are not independent inventory objects, but are part of the subgrade).

b) The superstructure of the track

1. Cleaning the ballast layer or updating the ballast with bringing the ballast prism to the dimensions established by the standards for of this type way.
2. Change of unusable sleepers.
3. Change of worn rails.
4. Change of unusable fasteners.
5. Straightening curves.
6. Repair of turnouts with the replacement of individual elements and transfer bars.
7. Change of turnouts.
8. Repair of the bridge deck.
9. Change of flooring of crossings or replacement of wood with reinforced concrete.

c) Artificial structures (bridges, tunnels, pipes)

1. Partial replacement of elements or complete replacement of worn-out superstructures.
2. Partial re-laying of stone and brick supports (up to 20% of the total volume).
3. Repair of concrete supports (up to 15% of the total volume).
4. Gunning or grouting of the surface of the supports.
5. Arrangement on supports of reinforcing reinforced concrete shells (jackets).
6. Repair or complete change of insulation.
7. Change of bridge beams.
8. Change of anti-theft bars.
9. Change of wooden flooring.
10. Change of flooring from reinforced concrete slabs.
11. Change of counter rails.
12. Change of damaged elements of wooden bridges, except for piles.
13. Replacement of wooden packages with reinforced concrete superstructures.
14. Partial re-laying of stone and brickwork of vaults and walls of tunnels.
15. Injection of cement mortar behind the tunnel lining.
16. Repair and replacement of drainage devices of tunnels.
17. Relocation of the pipe head.
18. Change of elements of wooden pipes (up to 50% of the volume of wood).
19. Change of elements of reinforced concrete or concrete pipes(up to 50% of the volume).

XIX. Car roads

a) ground bed

1. Treatment of subgrade in places of landslides, landslides, erosion and deeps.
2. Restoration of all drainage and drainage devices.
3. Restoration of all protective and fortifying structures of the subgrade.
4. Change of individual structures of artificial structures or their replacement with other structures, as well as a complete change of pipes and small bridges (if they are not independent inventory objects, but are part of the subgrade or road as a single inventory object).

b) Road clothes

1. Alignment and replacement of individual cement-concrete slabs.
2. Laying a leveling layer of asphalt concrete on the cement-concrete surface.
3. Installation of asphalt concrete pavement on roads with cement-concrete pavement.
4. Change of cement-concrete coating to a new one.
5. Strengthening the asphalt concrete pavement.
6. Reconstruction of crushed stone and gravel coatings.
7. Relocation of pavements.
8. Profiling of dirt roads.

c) Bridges, pipes

1. Partial re-laying of stone and brick supports (up to 20% of the total volume).
2. Repair of concrete supports (up to 15% of the total volume).
3. Change of damaged elements of wooden bridges, except for piles.
4. Change of wooden or reinforced concrete flooring, as well as replacement of wooden flooring with reinforced concrete.
5. Complete change or replacement of superstructures.
6. Relocation of pipe heads.
7. Change of elements of wooden, reinforced concrete or concrete pipes (up to 50% of the volume).

d) Sites for cars, road construction
and other machines, storage areas, as well as areas
grain receiving points

1. Repair and restoration of drainage structures (trays, ditches, etc.).
2. Relocation of cobblestone areas.
3. Reconstruction of crushed stone and gravel surfaces of sites.
4. Repair of concrete pads with laying a leveling layer of concrete.
5. Alignment and replacement of individual cement-concrete slabs.
6. Covering with asphalt concrete the sites listed in paragraphs 2 - 5.

XX. Electrical networks and communications

1. Change or replacement of unusable fittings.
2. Replacing hooks with traverses.
3. Change of wires.
4. Repair and change of end and connecting cable boxes.
5. Repair or replacement of grounding devices.
6. Change of supports (up to 30% per 1 km).
7. Installation of cable wells.

XXI. Other structures

1. Repair, change or replacement with other supports of racks for air laying of pipelines.
2. Repair or change of platforms, stairs and railings for overhead pipelines.
3. Repair or replacement of individual columns (up to 20%) of crane racks.
4. Repair or change of crane beams of crane racks.
5. Repair of galleries and fuel supply racks of boiler and gas generating substations with a change (up to 20%) of structures without changing foundations.
6. Change or complete replacement wooden poles fences (fences).
7. Repair or replacement of individual concrete and reinforced concrete pillars(up to 20%) and fences (fences).
8. Repair of individual sections of filling between fence posts (up to 40%).
9. Repair of separate sections of solid stone fences (up to 20%).
10. Repair of individual sections of solid adobe fences (up to 40%).
11. Repair of chimneys with the change or replacement of the lining, with the installation of hoops, with the restoration of the protective layer of reinforced concrete pipes.
12. Repair and replacement of individual sections of metal chimneys.
13. Repair of ash and slag dischargers with complete replacement of individual sections of the pipeline (without increasing the diameter).
14. Repair of loading platforms with a complete change of wooden flooring, blind area or asphalt. Change of individual supports or sections retaining walls(up to 20%). In the event that the unloading area is part of a storage facility (ramp), a complete change or replacement of all structures is allowed.

An approximate list of works performed during the overhaul of the housing stock; Appendix 8 to the Decree of the Gosstroy of the Russian Federation of September 27, 2003 N 170 "On approval of the Rules and norms for the technical operation of the housing stock"

EXAMPLE LIST
WORKS CARRIED OUT DURING MAJOR REPAIRS
HOUSING FUND

1. Examination residential buildings(including a complete survey of the housing stock) and the preparation of design estimates (regardless of the period of repair work).
2. Repair and construction work to change, restore or replace elements of residential buildings (except for the complete replacement of stone and concrete foundations, load-bearing walls and frames).
3. Modernization of residential buildings during their overhaul (re-planning, taking into account the downsizing of multi-room apartments; installation of additional kitchens and sanitary facilities, expansion of living space due to auxiliary premises, improvement of insolation of residential premises, elimination of dark kitchens and entrances to apartments through kitchens with a device, with necessary, built-in or attached premises for stairwells, sanitary facilities or kitchens); replacement of furnace heating with central heating with the installation of boiler rooms, heat pipelines and heat points; roof and other autonomous sources heat supply; re-equipment of furnaces for burning gas or coal in them; equipment with cold and hot water supply, sewerage, gas supply systems with connection to existing main networks with a distance from the input to the point of connection to the mains up to 150 m, the installation of gas ducts, water pumps, boiler rooms; complete replacement of existing systems central heating, hot and cold water supply (including with the obligatory use of modernized heating devices and pipelines made of plastic, metal-plastic, etc. and a ban on the installation steel pipes); installation of household electric stoves instead gas stoves or kitchen hearths; installation of elevators, garbage chutes, pneumatic waste disposal systems in houses with a landing of the upper floor of 15 m and above; transfer of the existing power supply network to increased voltage; repair of television antennas for collective use, connection to the telephone and radio broadcasting networks; installation of intercoms, electric locks, installation of fire-fighting automation and smoke removal systems; automation and dispatching of elevators, heating boilers, heating networks, engineering equipment; landscaping of courtyard areas (paving, asphalting, landscaping, fencing, wood sheds, equipment for children's and household playgrounds). Repair of roofs, facades, joints of prefabricated buildings up to 50%.
4. Insulation of residential buildings (works to improve the heat-shielding properties of enclosing structures, the installation of window fillings with triple glazing, the installation of external vestibules).
5. Replacement of intra-quarter engineering networks.
6. Installation of metering devices for the consumption of thermal energy for heating and hot water supply, consumption of cold and hot water on the building, as well as the installation of apartment meters for hot and cold water (when replacing networks).
7. Reconstruction of non-ventilated combined roofs.
8. Author's supervision of design organizations for the overhaul of residential buildings with full or partial replacement of ceilings and redevelopment.
9. Technical supervision in cases where subdivisions for technical supervision of major repairs of the housing stock have been created in local governments and organizations.
10. Repair of built-in premises in buildings.

List of works on major repairs of buildings and structures; Appendix 9 to the Order of the Ministry of Justice of Russia dated September 28, 2001 N 276 (as amended on January 24, 2006) "On approval of the instructions for the technical operation of buildings and structures of institutions of the penitentiary system")

Annex 9

LIST OF WORKS FOR CAPITAL REPAIRS OF BUILDINGS AND STRUCTURES

1.1. Foundations.
1.1.1. Changing wooden chairs or replacing them with stone or concrete pillars.
1.1.2. Partial re-laying (up to 15%), as well as strengthening of foundations and basement walls under the outer and inner walls and pillars of stone and wooden buildings that are not connected with the building superstructure or with additional loads from newly installed equipment.
1.1.3. Strengthening the foundations for the foundations of stone buildings that are not related to the superstructure of the building.
1.1.4. Restoration of vertical and horizontal insulation of foundations.
1.1.5. Restoration of the settled existing or construction of a new blind area around the building (more than 20% of the total blind area) in order to protect the soil under the foundations from erosion or waterlogging.
1.1.6. Repair of brick cladding of foundation walls from the basement side in separate places with the laying of more than 10 bricks in one place.
1.1.7. Partial or full restoration or device new waterproofing in basements.
1.1.8. Partial or complete re-laying of pits at the windows of the basement and basement floors.
1.1.9. Replacing rotten wooden foundation chairs in wooden buildings with new wooden, brick, concrete or reinforced concrete pillars.
1.1.10. Repair of existing drains around the building.
1.1.11. Replacement of single collapsing stone and concrete pillars.
Note. At the expense of funds for major repairs, it is possible to artificially fix the soils of foundations by chemical, thermal and other methods.

1.2. Walls and columns.
1.2.1. Relaying brick plinths (more than 10 bricks in one place).
1.2.2. Sealing of cracks in brick or stone walls with furrow clearing, with dressing of seams with old masonry.
1.2.3. Arrangement and repair of structures reinforcing stone walls.
1.2.4. Relaying dilapidated brick cornices, lintels, parapets, pits and protruding parts of walls.
1.2.5. Full or partial re-laying and fastening of individual dilapidated sections of brick walls (up to 25% of their total area in the building) that are not associated with the superstructure of the building or with additional loads from newly installed equipment, as well as the change of individual crowns in wooden buildings, also not exceeding 25% common wall surface.
1.2.6. Reinforcement of walls with tension and metal ties.
1.2.7. Change of fillings in walls with stone, reinforced concrete and metal frames (up to 40%).
1.2.8. Sealing cracks in brick walls with excavation and clearing of old masonry and installation of a new one, with bandaging of seams with old masonry.
1.2.9. Restoration of the waterproofing layer of the entire horizontal plane along the edge of the foundation.
1.2.10. Fastening or strengthening of stone walls that deviate from the vertical position and have deformations.
1.2.11. Relaying dilapidated cornices, parapets, firewalls, pits and protruding parts of walls.
1.2.12. Relaying individual, worn out, window and door lintels.
1.2.13. Insulation of dilapidated wooden walls with striped boards over roofing or with additional sheathing with boards and backfilled with fine slag.
1.2.14. Partial dismantling of existing internal walls and laying of new ones (up to 25% of the total volume), associated with the redevelopment of premises.
1.2.15. Replacement of various types of aggregates in walls with stone, reinforced concrete and metal frames(up to 50% of the total wall area).
1.2.16. Change of dilapidated crowns of log or block walls (up to 20%).
1.2.17. Continuous caulking of log or block walls.
1.2.18. Partial replacement of sheathing, backfilling and slab insulation of frame walls (up to 50% of the total wall area).
1.2.19. Change or repair of sheathing and insulation of wooden plinths.
1.2.20. Repair of stone plinths of wooden walls with their re-laying up to 50% of the total volume.
1.2.21. Setting up again and changing worn clamps of log and block walls.
1.2.22. Strengthening reinforced concrete and stone columns with clips.
1.2.23. Repair and partial replacement (up to 20%) of columns not associated with additional loads from newly installed equipment.

1.3. Partitions.
1.3.1. Repair, change and replacement of worn partitions with more advanced designs.
1.3.2. Partial redevelopment with an increase in the total area of ​​partitions (up to 20%).
1.3.3. Repair of partitions with the replacement of unusable strappings and boards in the amount of more than 2 m2 in one place.
1.3.4. Strengthening the sound insulation of partitions by upholstering them with an additional layer of hardboard, cardboard or other materials, followed by applying a layer of plaster, wallpapering or painting.
1.3.5. Replenishment of the backfill of two-layer partitions, followed by boarding and all finishing work.

1.4. Roofs and roofs.
1.4.1. Replacement of formwork boards in places of grooves and eaves slopes.
1.4.2. Replacement of dilapidated roof structures with a roof made of prefabricated reinforced concrete elements coated with roofing felt, roofing material and other roofing materials.
1.4.3. Full or partial replacement of dilapidated metal and reinforced concrete trusses.
1.4.4. Reinforcement of trusses when replacing types of coatings (wood-based panels with precast concrete, cold coating with warm coating, etc.), as well as with corrosion of nodes and other elements of metal and prefabricated reinforced concrete trusses.
1.4.5. Partial or complete replacement of rafters, mauerlats and battens under the roof.
1.4.6. Repair or replacement of worn-out metal railings on roofs.
1.4.7. Repair or replacement of worn outdoor fire escapes.
1.4.8. The device of new manholes on the roof, dormer windows and connecting bridges to them.
1.4.9. Relocation of chimney and ventilation pipes on the roof.
1.4.10. Continuous replacement of dilapidated wall gutters, slopes and covers around chimneys and other protruding devices above the roof.
1.4.11. Reconstruction of light lanterns with low illumination of premises to a large one.
1.4.12. Repair and painting of the supporting structures of skylights.
1.4.13. Repair of mechanical and manual opening and closing devices of skylight bindings.
1.4.14. Partial or complete replacement of dilapidated coating elements, as well as replacing them with more progressive and durable ones.
1.4.15. Partial (more than 10%) or complete change or replacement of the roof (all types).
1.4.16. Reconstruction of roofs in connection with the replacement of roofing materials.
1.4.17. Repair of coatings around chimneys and ventilation pipes, firewalls, parapets and other protruding parts on the roof.
1.4.18. Strengthening of parapets, steel gratings of the fence, repair of ventilation shaft heads, gas ducts, sewer risers and other protruding parts on the roof.
1.4.19. Restoration and repair of ladders for the safety of cleaning chimneys on roofs with soft coatings or having steep slopes.
1.4.20. Maintenance of outdoor fire escapes for climbing to the roof.

1.5. Interfloor ceilings and floors.
1.5.1. Repair or replacement of interfloor and attic floors.
1.5.2. Replacing individual floor beams, building up the ends of the beams with prostheses with all subsequent work. Replacing the selection between the beams.
1.5.3. Replacing individual structures or ceilings as a whole with more progressive and durable structures.
1.5.4. Strengthening of all elements of interfloor and attic floors.
1.5.5. Gunning of reinforced concrete floors in case of their damage.
1.5.6. Partial (more than 10%) or continuous change of floors (of all types) and their bases.
1.5.7. Reconstruction of floors during repairs with replacement with stronger and more durable ones, while the type of floors must comply with the requirements of norms and specifications for new construction.
1.5.8. Restoration of the concrete base under the floors with the installation of a new floor.
1.5.9. Re-laying clean plank floors with leveling the lag and adding new material.
1.5.10. Re-laying of parquet floors with correction or replacement of lathing.
1.5.11. Re-laying of floors on logs in the ground floors with correction or replacement of the base and restoration of brick columns.
1.5.12. Repair or replacement of underground canal walls.

1.6. Windows, doors and gates.
1.6.1. Complete replacement of dilapidated window and door blocks, as well as gates.

1.7. Stairs and porches.
1.7.1. Partial or complete change of landings, ramps and porches.
1.7.2. Change or strengthening of all types of stairs and their individual elements.
1.7.3. Replacement or repair of railings and handrails of stairs over 5% of their total number.
1.7.4. Installation of new porches.
1.7.5. Change of metal stringers or welding of damaged parts of stringers.

1.8. Internal plastering, facing and painting works.
1.8.1. Renewal of plastering of all premises and repair of plastering in the amount of more than 10% of the total plastered surface.
1.8.2. Upholstery of walls and ceilings with dry plaster.
1.8.3. Restoration or replacement of wall surface cladding in the amount of more than 10% of the total area of ​​cladding surfaces.
1.8.4. Renewal of stucco details indoors.
1.8.5. Painting of window casings, doors, ceilings, walls and floors after the overhaul of these structures.
1.8.6. Oil painting of radiators, heating pipes, water supply, sewerage, gasification after a major overhaul of the system or its new installation, if the costs are incurred at the expense of capital repairs.
1.8.7. Continuous anti-corrosion painting of metal structures.

1.9. facades.
1.9.1. Repair and renewal of cladding with an area of ​​more than 10% of the cladded surface of building facades with the replacement of individual tiles with new ones or plastering of these places with subsequent painting to match the color of the facing slabs.
1.9.2. Full or partial (more than 10%) renewal of the plaster.
1.9.3. Restoration or alteration of rods, cornices, belts, sandriks and other protruding parts of building facades.
1.9.4. Continuous replacement and installation of new drainpipes, as well as all external metal and cement coatings on the protruding parts of building facades.
1.9.5. Restoration of molding and stucco decorations and details.
1.9.6. Continuous painting of building facades with stable compositions.
1.9.7. Change or installation of new gratings and fences on the roofs and balconies of buildings.
1.9.8. Cleaning of facades and plinths with sandblasters.
1.9.9. Change or strengthening of all load-bearing and enclosing structures of balconies and bay windows.
1.9.10. Change of coverings of protruding parts of the building.
1.9.11. Restoration of old or installation of new gates.
1.9.12. Oil painting of facades of wooden buildings.

1.10. Furnaces and hearths.
1.10.1. Repair, alteration and installation of new stoves, kitchen hearths, cast-in boilers and chimneys for them.
1.10.2. Complete refurbishment or installation of new heating stoves, chimneys, ventilation ducts and chimneys and their foundations.
1.10.3. Conversion of heating stoves from wood to gas heating or heating with solid fuel.

1.11. Central heating.
1.11.1. The device of central heating instead of the stove with the adaptation of the existing room for a boiler room and the installation of a boiler room. In some cases, if it is impossible to adapt the existing premises for the boiler house, it is allowed to carry out an extension to the existing building of the premises with a built-up area of ​​\u200b\u200bno more than 65 m2 or build a new boiler house building.
1.11.2. Change of individual sections and assemblies of heating boilers, boilers, boiler units or complete replacement of boiler units (if they are not independent inventory objects).
1.11.3. Replacement of the existing central heating pipeline.
1.11.4. Repair and replacement of expanders, steam traps and other network equipment.
1.11.5. The device of remote furnaces and devices for boilers under the blast furnace.
1.11.6. Change and installation of additional sections of heating devices and individual sections of the pipeline.
1.11.7. Repair, re-laying or re-installation of foundations for boilers and other equipment.
1.11.8. Boiler room automation.
1.11.9. Replacing the insulation of pipelines that have become unusable.
1.11.10. Refurbishment of the lining of the boiler and chimneys.
1.11.11. Putting patches on a steel boiler, boiler, steamer, tank.
1.11.12. Manufacture and installation of a new casing.
1.11.13. Restoration or installation of a new lining and lining of central heating boilers.
1.11.14. Replacement of worn-out metal chimneys from boiler rooms.
1.11.15. Change of heating registers.
1.11.16. Connection of buildings to heating networks (with a distance from the building to the network of no more than 100 m).

1.12. Ventilation.
1.12.1. Installation of a new, restoration or reconstruction of the ventilation system.
1.12.2. Partial or complete replacement of air ducts.
1.12.3. Changing fans.
1.12.4. Rewinding or changing electric motors.
1.12.5. Change of gates, deflectors, throttle valves, blinds.
1.12.6. Partial or complete replacement of ventilation ducts.
1.12.7. Change of heaters.
1.12.8. Change of heating units.
1.12.9. Changing filters.
1.12.10. change of cyclones.
1.12.11. Change of individual designs of ventilation chambers.

1.13. Plumbing and sewerage.
1.13.1. Restoration or installation of a new internal water supply and sewerage of the building, pipelines, including water supply and sewerage inlets and their connection to the water supply and sewerage networks. The length of the line from the nearest water inlet or sewer outlet to the street network should not exceed 100 m.
1.13.2. Installation of new water intakes indoors.
1.13.3. Installation of additional manholes on existing yard lines or street networks at the points of connection.
1.13.4. Laying of underground lines of water and sewer pipes.
1.13.5. Replacing the cast-iron cisterns of the latrines with flush taps with alteration of the piping and shortening of the flush pipe.
1.13.6. Replacement of taps, valves and sanitary appliances.
1.13.7. Water tower device.
1.13.8. Installation of new sanitary facilities.

1.14. Hot water supply.
1.14.1. Change and installation of a new hot water supply.
1.14.2. Change of individual sections of the hot water pipeline.
1.14.3. Replacement of worn-out tanks, water heaters and water heaters.
1.14.4. Repair of tanks, coils and boilers, associated with complete disassembly and replacement of individual components and parts.
1.14.5. Change of the pipeline, parts and, in general, pumping units, tanks and pipeline insulation.
1.14.6. Change and installation of baths, showers and fittings for them (shower nets with pipelines, taps, flexible hoses).

1.15. Electrical lighting, communications and power wiring.
1.15.1. Installation of new electric lighting in residential and public buildings and connection to the power supply network.
1.15.2. Replacement of worn-out lighting wiring with a change of installation fittings (switches, knife switches, plugs, cartridges, sockets), and in the event of a major overhaul of the building - the installation of new wiring.
1.15.3. Installation of new and replacement of group distribution and safety boxes and shields.
1.15.4. Reconstruction of electrical wiring with the installation of additional fittings in connection with the redevelopment of the premises.
1.15.5. Automation of electric lighting in the stairwells of buildings.
1.15.6. Replacement of metering devices and protection devices for electrical installations.
1.15.7. Repair or restoration of cable channels.
1.15.8. Replacement of lamps for other types (conventional for fluorescent, etc.).

1.16. Gas supply.
1.16.1. Installation of additional gas equipment in apartments with its connection to the gas network.
1.16.2. Gasification of individual apartments.
1.16.3. Change of individual sections of the gas pipeline.
1.16.4. Replacement of equipment that has become unusable (gas stoves, water heaters) with new equipment.

1.17. Elevators and lifts.
1.17.1. Re-installation of elevators with all types of construction and installation works.
1.17.2. Full or partial replacement of electrical equipment and cargo elevator winches.
1.17.3. Strengthening, full or partial change of metal structures and fencing nets of the mine.
1.17.4. Complete or partial change of electrical wiring in mines.
1.17.5. Dismantling and installation of elevator equipment in connection with work to reduce noise in premises with a permanent presence of people.
1.17.6. Elevator automation.

2. Structures

2.1. Water supply and sewerage facilities. Pipelines and network fittings.
2.1.1. Partial or complete replacement of the anti-corrosion insulation of the pipeline.
2.1.2. Change of individual sections of the pipeline without changing the diameter of the pipes. At the same time, it is allowed to replace cast-iron pipes with steel pipes, ceramic pipes with concrete or reinforced concrete pipes and vice versa, but it is not allowed to replace asbestos-cement pipes with metal pipes (except in emergency cases).
The length of network sections where a continuous change of pipes is allowed should not exceed 200 m per 1 km of the network.
2.1.3. Change of worn fittings, valves, fire hydrants, air vents, valves, standpipes or their repair with the replacement of worn parts.
2.1.4. Change of individual siphon pipes.

2.2. Water supply and sewer networks. Wells.
2.2.1. Repair of masonry wells.
2.2.2. Changing hatches.
2.2.3. Stuffing again trays to replace the destroyed ones.
2.2.4. Replacing worn-out wooden wells.
2.2.5. Restoration of plaster.

2.3. Water supply and sewer networks. Treatment facilities.
2.3.1. Repair or replacement (totally) waterproofing.
2.3.2. Repair and renewal of plaster and ironing.
2.3.3. Relaying brick walls and partitions (up to 20% of the total volume of masonry in the structure).
2.3.4. Sealing leaks in reinforced concrete, concrete and stone walls and bottoms of structures with concrete dismantling in separate places and concreting again.
2.3.5. Continuous shotcrete of the walls of structures.
2.3.6. Repair of drainage around structures.
2.3.7. Replacement of hatches of tanks.
2.3.8. Grating replacement.
2.3.9. Replacement of loading of filters, biofilters, aerofilters.
2.3.10. Replacement of pipelines and fittings.
2.3.11. Change of filter plates.
2.3.12. Relaying the drainage system of silt pads.

2.4. Heat supply. channels and cameras.
2.4.1. Partial or complete change of coatings of channels and chambers.
2.4.2. Partial or complete change of waterproofing of channels and chambers.
2.4.3. Partial re-laying of the walls of brick channels and chambers (up to 20% of the total surface of the walls).
2.4.4. Partial relocation of drainage systems.
2.4.5. Repair of the bottoms of channels and chambers.
2.4.6. Renewal of the protective layer in reinforced concrete structures of channels and chambers.
2.4.7. Changing hatches.

2.5. Heat supply. Pipelines and fittings.
2.5.1. Partial or complete change of thermal insulation of the pipeline.
2.5.2. Renewal of pipeline waterproofing.
2.5.3. Change of individual sections of the pipeline without increasing the diameter of the pipes.
2.5.4. Change of fittings, valves, compensators or their repair with the replacement of worn parts.
2.5.5. Replacement of movable and fixed supports.

2.6. Car roads. Ground cloth.
2.6.1. Treatment of subgrade in places of landslides, landslides, erosion and abysses.
2.6.2. Restoration of drainage and drainage devices.
2.6.3. Restoration of protective and fortifying structures of the subgrade.
2.6.4. Change of individual structures of artificial structures or their replacement with other structures, as well as a complete change of pipes and small bridges (if they are not independent inventory objects, but are part of the subgrade or road as a single inventory object).

2.7. Car roads. Road clothes.
2.7.1. Alignment and replacement of individual cement-concrete slabs.
2.7.2. Laying a leveling layer of asphalt concrete on a cement-concrete surface.
2.7.3. Installation of asphalt concrete pavement on roads with cement-concrete pavement.
2.7.4. Change of cement-concrete pavement to a new one.
2.7.5. Strengthening of asphalt concrete pavement.
2.7.6. Reconstruction of crushed stone and gravel coverings.
2.7.7. Bridge relocation.
2.7.8. Profiling of dirt roads.

2.8. Warehouse and other sites.
2.8.1. Repair and restoration of drainage structures (trays, ditches, etc.).
2.8.2. Relocation of cobblestone areas.
2.8.3. Reconstruction of crushed stone and gravel coverings of sites.
2.8.4. Repair of concrete platforms with laying of a leveling layer of concrete.
2.8.5. Leveling and replacement of individual cement-concrete pads.
2.8.6. Covering sites with asphalt concrete.

2.9. Electrical networks and communications.
2.9.1. Change or replacement of fittings.
2.9.2. Replacing hooks with traverses.
2.9.3. Wire change.
2.9.4. Repair and change of end and connecting cable boxes.
2.9.5. Repair or replacement of grounding devices.
2.9.6. Change of supports (up to 30% per 1 km).
2.9.7. Installation of cable wells.

2.10. Other buildings.
2.10.1. Repair, change or replacement with other supports of racks for air laying of pipelines.
2.10.2. Repair and replacement of platforms, stairs and railings for overhead pipelines.
2.10.3. Repair or change of individual columns (up to 20%) of crane racks.
2.10.4. Repair or replacement of crane beams of crane racks.
2.10.5. Repair of galleries and fuel supply racks of boiler and gas generating substations with a change (up to 20%) of structures without changing foundations.
2.10.6. Change or complete replacement of wooden fence posts.
2.10.7. Repair or change of individual concrete and reinforced concrete pillars (up to 20%) of fences.
2.10.8. Repair of individual sections of fencing elements (up to 40% filling between posts).
2.10.9. Repair of separate sections of solid stone fences (up to 20%).
2.10.10. Repair of individual sections of solid adobe fences (up to 40%).
2.10.11. Repair of chimneys with the change or replacement of the lining, with the installation of hoops, with the restoration of the protective layer of reinforced concrete pipes.
2.10.12. Repair and replacement of individual sections of metal chimneys.
2.16.13. Repair of ash and slag dischargers with complete replacement of individual sections of pipelines (without increasing the diameter).
2.12.14. Repair of loading platforms with a complete change of wooden flooring, blind area or asphalt. Change of individual supports or sections of retaining walls (up to 20%). If the unloading area is part of a storage facility (ramp), a complete change or replacement of all structures is allowed.

The list of works on the overhaul of apartment buildings to be included in the scope of works financed from the funds provided for by Federal Law N 185-FZ; Table 2.3 ( "Methodological recommendations for the formation of the scope of works for the overhaul of apartment buildings financed from the funds provided for by the Federal Law of July 21, 2007 N 185-FZ "On the Fund for Assistance to the Reform of the Housing and Communal Services" (approved by the State Corporation "Fund for Assistance to the Reform of Housing and Communal Services" 15.02.2013)

This list is formed on the basis of the updated lists of work on major repairs recommended by the above normative documents within the framework of the types of work on the overhaul of apartment buildings, defined by Article 15 of the Federal Law N 185-FZ. At the same time, it is assumed that the provisions of these guidelines apply to apartment buildings that are subject to major repairs without stopping their operation. As a result of the overhaul, all necessary work to bring the common property of an apartment building into technical working condition by restoring or replacing all parts of structures and engineering systems, which have shorter service lives between successive (according to normative term services) overhauls than load-bearing structures.

2.3.2. Consistent and methodical linking of technological processes to the list of works given in Table 2.3 of these recommendations is contained in Section 3.

Table 2.3

Name of types of work in accordance with Part 3 of Article 15 of Federal Law N 185-FZ

Subspecies and list of works

Repair of intra-house engineering systems of electricity, heat, gas, water supply, sanitation

1. Repair or replacement of engineering systems:

1.1. Cold water supply, including:

1.1.1. Repair or replacement of water meter units;

1.1.2. Repair or replacement of distributing highways and risers;

1.1.3. Replacement stop valves, including on a branch from the risers to the apartment;

1.1.4. Repair or replacement of booster equipment in the complex pumping units

1.1.5. Repair or replacement of equipment, pipelines and fire water supply equipment

1.2. Repair or replacement of the hot water system, including:

1.2.1. Repair or replacement of TRZH, heat exchangers, boilers, pumping units and other equipment (as part of the common property) in the complex for the preparation and supply of hot water to the distribution network;

1.2.2. Repair or replacement of distributing highways and risers;

1.2.3. Replacement of shut-off valves, including those on a branch from the risers to the apartment.

1.3. Repair or replacement of the sewerage and drainage system, including:

1.3.1. Repair or replacement of outlets, prefabricated pipelines, risers and hoods;

1.3.2. Replacing valves, if any;

1.4. Repair or replacement of the heating system, including;

1.4.1. Repair or replacement of distributing highways and risers;

1.4.2. Replacement of shut-off and control valves, including those on a branch from risers to heating appliances in residential premises;

1.4.3. Regrouping or replacement of heating devices in common areas and replacement of heating devices in residential premises that do not have disconnecting devices;

1.4.4. Installation, repair or replacement in the complex ITP equipment(individual heating points) and in the presence of booster pumping units

1.5. Repair or replacement of the gas supply system, including:

1.5.1. Repair or replacement of intra-house distributing highways and risers;

1.5.2. Replacement of shut-off and control valves, including those on a branch from risers to household gas appliances in residential premises;

1.6. Repair or replacement of the power supply system, including:

1.6.1. Repair or replacement of the main switchboard (main switchboard), distribution and group boards;

1.6.2. Repair or replacement of intra-house distributing highways and risers of communal and apartment lighting;

1.6.3. Replacement of branches from floor shields or boxes of apartment meters and installation and lighting fixtures public lighting;

1.6.4. Replacement of electrical networks to power the electrical equipment of elevators and electrical equipment to ensure the operation of engineering systems;

2. Modernization of engineering systems, including:

2.1. Mandatory use of modernized heating devices and pipelines made of plastic, metal-plastic, etc. and a ban on the installation of steel pipes

2.2. Transfer of the existing power supply network to increased voltage;

2.3. Replacement of lighting fixtures for public lighting needs with energy-saving ones;

2.4. Re-equipment of heating points and water metering units;

3. Replacing stove heating with central heating

with device

boiler houses,

heat pipelines and

thermal points;

roof and other autonomous sources of heat supply

4. Equipment systems

cold and

hot water supply,

sewer,

gas supply

with accession

to existing backbone networks with a distance from the input to the point of connection to the mains up to 150 m,

device

gas ducts,

water pump,

boiler rooms.

Repair or replacement of elevator equipment recognized as unsuitable for operation, if necessary, repair of elevator shafts

Repair and replacement of elevator equipment with its modernization, including:

1. Repair or complete replacement of elevator equipment, recognized as unsuitable for operation;

2. Repair, if necessary, mines, replacement of side mines;

3. Repair of machine rooms;

4. Repair, replacement of automation elements and scheduling of elevator equipment;

5. Equipment of devices necessary for connection to existing systems automation and dispatching of elevator equipment

Roof repair

1. Repair of roof structures:

1.1. From wooden structures:

1.1.1. Repair: with partial replacement

rafter legs,

Mauerlatov

Lathing solid and discharged from bars

1.1.2. Antiseptic and fireproofing of wooden structures.

1.1.3. Insulation of the under-roof (attic) floor

1.1.4. Repair (replacement of dormers)

1.2. From reinforced concrete rafters and roofing decks:

1.2.1. Troubleshooting reinforced concrete rafters and roof decks;

1.2.2. Insulation of the under-roof (attic) floor

1.2.3. Roofing screed repair;

2. Replacement of roof coverings

2.1. Complete replacement metal coating roofs with connection device;

2.2. Complete replacement of the roof covering from rolled bituminous materials (roofing material) for roofs from built-up materials with adjoining device

2.3. Complete replacement of the roof covering from piece materials (slate, tiles, etc.) with adjoining device

3. Repair or replacement of the drainage system (overhangs, gutters, grooves, trays) with the replacement of drainpipes and products (external and internal);

4. Repair or replacement of roofing elements

4.1. Roof hole repair

4.2. Repair of air vents, repair or replacement of dormer windows and other devices for ventilation of the attic space;

4.3. Change of caps on the heads of smoke ventilation blocks and ventilation shafts;

4.4. Change of openings of parapets, firewalls, superstructures

4.5. Repair (plastering, painting) and insulation of smoke ventilation units and elevator shafts

4.6. Restoration or replacement of the fence on the attic roof;

5. Reconstruction of non-ventilated combined roofs to ventilated ones with insulation of the under-roof (attic) floor

Repair of basements belonging to common property in apartment buildings

1. Repair of sections of basement walls and floors

2. Insulation of walls and basement ceilings of basements

3. Waterproofing the walls and floor of the basement

4. Repair technical premises with the installation of metal doors.

5. Repair of air ducts, basement windows, pits and external doors

6. Sealing the passages of inputs and outputs of engineering networks in the outer walls (performed during the repair of networks)

7. Repair of the blind area

8. Repair or replacement of the drainage system

Warming and repair of facades

1. Repair of facades that do not require insulation

1.1. Repair of plaster (texture layer), including architectural order;

1.2. Repair of facing tiles;

1.3. Painting on plaster or on a textured layer;

1.4. Repair and restoration of sealing of horizontal and vertical joints wall panels large-block and large-panel buildings;

1.5. Repair and restoration from the side of the facade of the sealing of the joints of window and doorways common areas;

1.6. Painting from the side of the facade of window frames;

1.7. Repair of enclosing walls;

1.8. Repair and replacement of windows and balcony doors(as part of common property);

1.9. Repair or replacement of exterior doors.

2. Work on the repair of facades requiring insulation

2.1. Repair and insulation of enclosing walls with subsequent surface finishing

2.2. Repair of windows and balcony doors (as part of the common property) or replacement with windows and doors in an energy-saving design(window blocks with triple glazing, etc.) with their subsequent insulation (sealing)

2.3. Repair of entrance external doors with their subsequent insulation or replacement with metal doors in an energy-saving design

3. Work common to both groups of buildings

3.1. Repair of balconies with replacement of consoles if necessary, waterproofing and sealing with subsequent painting

3.2. Reinforcement of canopy structures above entrances and last floors with subsequent surface finishing

3.3. Strengthening the structures of cornice blocks with subsequent surface finishing

3.4. Changing window sills

3.5. Change of drainpipes

3.6. Basement repair and insulation

Installation of collective (common house) metering devices for resource consumption and control units (thermal energy, hot and cold water, electrical energy, gas)

Installation of collective (common house) consumption meters:

Thermal energy for the needs of heating and hot water supply;

cold water consumption,

electrical energy,

Resource management nodes, with equipment for automation and dispatching devices to provide remote accounting and control;

Repair of the foundations of apartment buildings.

1. Repair or replacement of foundations.

1.1. Sealing and jointing of joints, seams, cracks in foundation elements. Protective layer device.

1.2. Elimination of local defects and deformations by strengthening the foundation.

Notes:

1. During the overhaul of structures and engineering systems as part of the common property of an apartment building, as determined by Federal Law 185-FZ, at least 50% of each structure and engineering system is replaced.

2. In-house heating systems as part of common property include: risers, heating elements in common areas, in residential premises - branches from risers to the first disconnecting device (if it is not available, to the point of interface with a heater, heating element), regulating and stop valves; collective (common house) heat energy meters, as well as other equipment located on these networks.

3. In the event that during the performance of work on the overhaul of structures and engineering systems as part of the common property of MD, due to the technological and design features of the repaired (replaced) structures and engineering systems, it is necessary to dismantle or destroy parts of the property that is not part of the common property of MD , work on its restoration is carried out at the expense of capital repairs, which should be provided for in the design and estimate documentation.

4. In the event that a heating system with a hidden laying of pipelines, which is not repairable (Appendix 2), is designed in an apartment building, it is allowed to re-install a heating system with open laying of pipelines and heating appliances, heating elements, including in residential areas.

Recently, citizens of the Russian Federation began to be persistently interested in the question of what is included in the overhaul. Although this trend is quite predictable, after a recent legislative amendment, according to which, since 2014, all owners of apartments in multi-apartment buildings are required to pay contributions for major repairs. Let's look at what and in what amounts Russians will pay cash contributions under the new law.

Let's start with the fact that payments must be monthly and their size is set by each subject of the Russian Federation separately. To find out information that is relevant to you, go to the website of the Regional Capital Repair Fund (of course, your region). Here you can also get acquainted with the legislative acts regulating your rights and obligations. Russians have only two loopholes in order not to pay contributions for overhaul: if the house is declared unsafe and is subject to demolition, and if the land under the house is liked by civil servants for municipal needs. In the latter case, apartment owners are not only exempt from contributions from the moment the house is given a new status, but also receive back their previous payments. As for citizens with low incomes, they were also taken care of. Those who receive housing subsidies and utilities, they will be increased in proportion to the increase in the cost of contributions for capital repairs. In general, the state promises that material condition low-income people will not be affected. If you purchased a home whose previous owner owes monthly maintenance fees, then, as with utility bills, you inherited the debts along with the apartment and must pay them. By the way, the amount of contributions is reviewed annually, so sometimes re-read the articles of the Housing Code, namely section IXto know the latest information. Now let's look at what is included in the overhaul. Basically, almost everything. Due to monthly savings, residents of the house have the right to:
  • repair and insulate facades and plinths;
  • repair and glaze balconies and loggias;
  • replace window and balcony fillings with soundproof ones;
  • replace or repair a drain;
  • repair fire escapes;
  • repair foundations and cellars;
  • replace or repair roofing;
  • tidy up the entrance to the entrance - repair or replace the doors and equip the door platforms.

The overhaul also includes:

  • central heating;
  • ventilation;
  • water supply;
  • sewerage and drainage;
  • electrical equipment;
  • garbage chutes;
  • fire fighting systems;
  • domestic gas supply;
  • interior decoration (in case of violation appearance due to house renovations)
  • landscaping;
  • elevators.

By the way, in the last paragraph, the legislation provides for ensuring the accessibility of elevators for the disabled.

The types and terms of work are determined individually for each house, depending on its condition and age. To clarify the types and terms of work planned in your home, you can:

  • Online ;
  • on the portal . In the search section, enter the address of your house, on the right, select "Apartment Buildings", then select "Regional Capital Improvement Program";
  • on the official website of the Mayor of Moscow.

If the overhaul of your house will be carried out at the expense of the Fund for the Overhaul of Apartment Buildings in the City of Moscow, the fund will notify you of the timing and list of planned work. may approve or reject the proposed list.

2. Which houses are not included in the capital renovation program?

3. How to pay for overhaul?

From January 1, 2019, all property owners pay for major repairs at a single minimum rate of 18.19 rubles per square meter they own.

The capital repair payment is included on your monthly utility bill or single payment document (UDP). To pay for major repairs, pay the full amount indicated on the receipt.

The rate of 18.19 rubles per square meter is the minimum, it can be increased by decision general meeting owners. All collected funds are sent to the Capital Repair Fund for Moscow apartment buildings, or the so-called all-Moscow mutual assistance fund. By decision, the funds can be transferred to a special account at home in the bank.

4. What is a special house bank account?

The funds accumulated in a special house bank account can only be spent on the repair of this house. The intended use of funds on the account is controlled by the bank - the account holder and the Moscow Housing Inspection.

The tenants themselves choose a contractor and control the quality of the overhaul work, sign the act of acceptance and determine what the contribution for the overhaul will be (but not less than 18.19 rubles per square meter).

However, home repairs must still be completed within the time frame set by the regional program. If homeowners do not have time to accumulate the required amount, they will have to increase the contribution for major repairs. If they accumulate the required amount earlier, they have the right to carry out major repairs ahead of the deadline.

When selling an apartment, it is impossible to get back funds from a special house account in a bank. The rights to them will pass to the new owner of the apartment. Lenders will also not be able to withdraw them.

5. How to switch to a special bank account at home?

Step 1. Make sure your home is on.

Step 2 Make sure your home hasn't already been transferred to a special account. To do this, check if it is in the corresponding .

Step 3 Spend In addition, the meeting must approve:

  • the amount of the monthly installment;
  • list of works and terms of work (in accordance with the regional program or according to a separate schedule, with which the participants of the meeting should be familiarized separately);
  • the bank where the special account will be opened, from the list approved by the Bank of Russia;
  • the owner of a special account (only a legal entity can act as such);
  • an individual authorized to open a special account;
  • sources of financing for the maintenance and servicing of the account (monthly contributions over 18.19 rubles per square meter or other income of an apartment building).
"> a general meeting of the owners of the premises of your house. To switch to a special account, you need at least two-thirds of the owners to vote for. How to hold a general meeting, you can read in ours.

Step 4 Open a special account with one of the Russian banks listed in this list of the Central Bank of Russia. The owner of the account can be a regional operator (Fund for Capital Repairs of Apartment Buildings in the City of Moscow), a homeowners association (HOA), Management Company, housing, housing construction or other specialized consumer cooperative.

Step 5 After opening an account, within five working days, send a certificate from the bank and a copy of the minutes of the general meeting of owners to Moszhilinspeziya: 129090, Moscow, Prospect Mira, 19, building 1 and to the Capital Repair Fund of the City of Moscow: 129090, Moscow, Prospekt Mira, house 9, building 1. If the account is managed by the Capital Repair Fund of the city of Moscow, you can not notify the Moscow Housing Inspectorate. Within 10 days, inform all the owners of the premises in your house about the decision.

Step 6 Provide all owners with new details for paying contributions for major repairs.

The decision of the general meeting of owners will come into force three months after you notify the Capital Repair Fund for Moscow apartment buildings. The fund will transfer the unused funds for the overhaul of your home to your new account within five working days after the end of three months from the date of the decision. The Fund has the right not to transfer funds if there is a debt, an outstanding loan or a loan to pay for services rendered or major repairs performed.

6. What is the “All-Moscow “Mutual Assistance Fund”?

With this method of accumulation, funds for major repairs collected by residents go to the regional fund - the Moscow-wide mutual assistance fund. The funds are kept in a single account with the Central Bank of Russia, from which, based on the approved schedule, the capital repairs of all houses that have chosen this method of accumulation are paid.

If you live in a house that needs major repairs, you will have work done at the expense of the residents of new buildings, but then you will pay money to the fund to make major repairs to them, and vice versa. When choosing this option, the owners do not need to organize repairs themselves, ensure the safety of the collected funds, and so on. These issues are dealt with by the Capital Repair Fund for Moscow apartment buildings, a regional operator established by the Moscow Government. Full list beneficiaries you can see on the website of the City Center for Housing Subsidies. In addition to them, the following are entitled to social support:

  • living alone and unemployed Muscovites who own housing and have reached the age of 70 - to compensate for 50% of contributions for overhaul, who have reached the age of 80 - 100%;
  • Muscovites who own housing, live in a family consisting only of non-working pensioners, and who have reached the age of 70 - for compensation of 50% of contributions for major repairs, who have reached the age of 80 - 100%;
  • non-working disabled people of I and (or) II groups.

Readers often request to tell what types of work, according to the Housing Code of the Russian Federation, relate to the overhaul of an apartment building, and which to the current one.

To avoid confusion about which events in the life of the house are related to the current repair, you need to remember: the current repair is planned, i.e. these are exclusively those works that are included in the previously adopted estimate, work plan, etc.

Current repairs do not include emergency work and work related to the maintenance of the house.

Maintenance It is a replacement of some part, not the whole. For example, if in the entrance window you want to insert broken glass- this is a current repair, and if a worn window is completely replaced - this is a major overhaul. It follows from this: with respect to any part of the house, both current and major repairs can be carried out.

Current repairs by points

Foundations:

Sealing and jointing of seams, cracks, restoration of wall foundation cladding, etc.
Elimination of local deformations by repositioning, strengthening, etc.

Strengthening (arrangement) of foundations for equipment (ventilation, pumping, etc.).
Change of individual sections of strip, pillar foundations or chairs under wooden buildings.
Installation and repair of ventilation products.
Change or repair of blind areas.
Restoration of pits, entrances to cellars.
Restoration of damaged sections of the foundation.

Walls and facades:

Sealing cracks, jointing, re-laying of individual sections of brick walls.
Sealing joints of elements of prefabricated buildings, sealing potholes and cracks on the surface of blocks and panels.
Punching (sealing) of holes, nests, furrows.
Restoration of individual piers, lintels, cornices, ebbs.
Change of individual crowns, frame elements, strengthening, insulation, caulking of grooves, change of sections of wooden wall sheathing.
Warming of freezing sections of walls in separate rooms.
Replacement of coatings, protruding parts on the facade. Replacement of drains on window openings.
Restoration of areas of plaster and cladding, moldings.
Repair and painting of facades.
Plinth repair and painting.

Covers:

Temporary fixing of ceilings.
Partial replacement or reinforcement of individual elements of wooden floors.
Sealing potholes and cracks in reinforced concrete structures.
Insulation of upper shelves steel beams in the attic. Beams coloring.
Sealing seams and cracks.

Roofs:

Reinforcement of wooden elements truss system, including the change of individual rafter legs, racks, struts, sections of ridge runs, beds, mauerlats, fillies and battens.
Antiseptic and fire protection wooden structures.
All types of repair work on steel, asbestos-cement and other roofs made of piece materials (except for the complete replacement of the coating), including all elements adjoining structures, parapet coatings, caps and umbrellas over pipes, etc.
Replacement of downpipes and their elements.
Partial repair of the rolled roof with the replacement of individual sections.
Complete replacement of the upper layer of the rolled carpet with partial replacement of the underlying layers.
3mena (restoration) of individual sections of non-rolled roofs (from piece material and metal).
Installation or restoration of the protective and finishing layer of rolled and non-rolled roofs.
Replacement of sections of parapet gratings, fire escapes, ladders, sleeves, fences, anchors or radio poles, building grounding devices with restoration of watertightness of the attachment point.
Restoration and installation of new transitions to the attic through heating pipes, ventilation ducts.
Restoration and repair of valleys, ridges and cornice ventilation products.
Repair of waterproofing, vapor barrier and restoration of the attic insulation layer.
Repair of dormer windows and exits to roofs.
Equipment for stationary devices for fastening safety ropes.

Window and door fillings:

Change, restoration of individual elements, partial replacement of window and door fillings related to common house property.
Installation of spring closers, stops, etc.
Partitions related to common property.
Strengthening, changing individual sections of wooden partitions.
Repairing cracks in slab partitions, re-laying of their individual sections.
Improving the soundproofing properties of partitions (sealing mates with adjacent structures, etc.).

Stairs, balconies, porches (canopy umbrellas) above the entrances to the entrances, basements, above the balconies of the upper floors:

Sealing of potholes, cracks of steps and platforms.
Replacement of individual steps, treads, risers.
Partial replacement and strengthening of metal railings, elements of stairs.
Sealing potholes and cracks in concrete and reinforced concrete balcony slabs, porches, umbrellas; replacement of boardwalk with roofing steel sheathing, replacement of balcony grilles.
Restoration or replacement of individual elements of the porches; restoration or installation of umbrellas over the entrances to the entrances, basements and over the balconies of the upper floors.
Installation of metal gratings, window fencing over the entrances to the basement.

Floors:

Replacement of individual sections of flooring in common areas.
3replacement (installation) of waterproofing of floors in separate sanitary facilities with complete resurfacing.

Interior finish:

Restoration of plaster walls and ceilings in separate places. Restoration of wall and floor cladding with ceramic and other tiles in separate places in auxiliary rooms - stairwells, basements, attics.
All types of painting and glazing work in auxiliary premises - stairwells, basements, attics.
Restorative repair of damage caused in connection with the elimination of emergency situations.

Central heating:

Change of individual sections of pipelines, sections, heating devices, shut-off and control valves related to common house property.
Installation (if necessary) of air valves.
Warming of newly laid pipelines, devices, expansion tanks, ramps.
Relaying, lining of hogs, chimneys.

Ventilation:

Change of individual sections and elimination of leaks in ventilation ducts, shafts and chambers.
Replacement of fans, air valves, other equipment in common areas.

Plumbing, sewerage, hot water supply:

Replacing individual sections of pipelines of in-house systems, sealing joints, eliminating leaks, strengthening and insulating newly laid pipelines, hydraulic test systems.
Replacement of individual taps, faucets, showers, sinks, sinks, washbasins, toilet bowls, bathtubs, shut-off valves in common areas, including the first disconnecting device located on a branch from the risers.
Insulation and replacement of fittings for water tanks in the attic.
Replacement of internal fire hydrants.
Repair of pumps and electric motors, replacement of individual pumps and low power electric motors.
Installation, replacement and restoration of the health of individual elements and parts of elements related to common house property.

Electrical devices:

Replacement of faulty sections of the electrical network of the building, excluding Electricity of the net residential apartments.
Replacement of lamps in common areas of buildings.
Replacement of fuses, circuit breakers, batch switches of input distribution devices, shields.
Replacement and installation of photo switches, time relays and other automatic or remote control illumination of common areas.
Replacement of electric motors and individual units of electrical installations of engineering equipment of the building.
Repair of stationary electric stoves included in the common house property.

Special general house technical devices:

Replacement and restoration of elements and parts of elements of special technical devices according to the regulations established by manufacturers or authorized federal executive bodies.

Garbage chutes:

Restoration of operability of ventilation and flushing devices, covers of garbage inlets and gate devices and other elements of the garbage chute.

External landscaping:

Repair and restoration of destroyed sections of sidewalks, driveways, paths, fences and equipment for sports, utility and recreation areas, platforms and sheds for garbage containers. Replacement of sports ground equipment.

Internal gas supply system:

Installation, replacement and restoration of operability of intra-house gas equipment, which is part of the common property of the house.

Capital repairs in an apartment building

Article 174 of the Housing Code of the Russian Federation. Use of funds from the Capital Improvement Fund

1. Funds from the capital repair fund may be used to pay for services and (or) work on capital repairs of common property in an apartment building, development project documentation(if the preparation of project documentation is necessary in accordance with the legislation on urban planning), payment for construction control services, repayment of loans, loans received and used in order to pay for these services, works, as well as to pay interest on the use of such loans, loans, payment of expenses for obtaining guarantees and guarantees for such loans, loans.

At the same time, at the expense of the overhaul fund, within the amount formed on the basis of the minimum contribution for overhaul established by the regulatory legal act of the constituent entity of the Russian Federation, ONLY the work provided for by Part 1 of Article 166 of this Code and the work provided for by the law of the subject may be financed. Russian Federation, repayment of credits, loans received and used to pay for these works, and payment of interest for the use of these credits, loans.

The specified part 1 of article 166 is the list of services and works for the overhaul of common property in an apartment building.

It "includes:

repair of intra-house engineering systems of electricity, heat, gas, water supply, sanitation;

repair or replacement of elevator equipment recognized as unsuitable for operation, repair of elevator shafts;

roof repairs, including the conversion of a non-ventilated roof to a ventilated roof, arrangement of exits to the roof;

repair of basements belonging to common property in an apartment building;

facade insulation and repair;

installation of collective (common house) metering devices for the consumption of resources necessary for the provision of public services, and control units and regulation of the consumption of these resources (thermal energy, hot and cold water, electricity, gas);

repair of the foundation of an apartment building.

Loading...Loading...