Assembler for the installation of steel and reinforced concrete structures. Assembler for the installation of steel and reinforced concrete structures Assembler of the 5th category

Fitter for the installation of steel and reinforced concrete structures of the 5th category

A sample of the installer's instructions for the installation of steel and reinforced concrete structures of the 5th category

A sample job description is drawn up taking into account the professional standard

1. General Provisions

1.1. Assembler for the installation of steel and reinforced concrete structures of the 5th

category is a worker and reports directly to ……… (name of the position / profession of the manager)

1.2. To work as an installer for the installation of steel and reinforced concrete structures of the 5th category, a person who has reached the age of 18 is accepted:

1) having a secondary vocational education and trained in training programs for skilled workers, as well as training in additional professional programs (training programs);

2) having experience as an installer in the installation of steel and reinforced concrete structures of the 4th category for at least three years.

1.3. To work specified in paragraph 1.2 of these instructions, a person is allowed:

1) passed in accordance with the Procedure for conducting mandatory preliminary and periodic medical examinations (examinations) of workers engaged in heavy work and work with harmful and (or) dangerous working conditions, approved. Order of the Ministry of Health and Social Development of Russia dated April 12, 2011 N 302n, mandatory preliminary (when applying for a job) and periodic medical examinations (examinations), as well as extraordinary medical examinations (examinations);

2) trained in safe methods and techniques for performing work, briefing on labor protection, internship at the workplace and testing of knowledge and labor protection requirements.

1.4. The performance of independent climbing work can be entrusted to an installer for the installation of steel and reinforced concrete structures of the 5th category, recognized as fit for this work according to the results of a medical examination, if he has at least 3 years of experience in climbing work, provided that he is provided with a safety belt.

1.5. The fitter for the installation of steel and reinforced concrete structures of the 5th category must know:

1) documents, objects, methods and techniques for performing work of a lower qualification, provided for by production (by profession) instructions and (or) professional standard;

2) devices and rules for the use of lifting equipment;

3) rules for the selection of steel ropes for rigging;

4) rules for the operation of a mechanized tool;

5) terms of wear and methods of lubrication of steel ropes;

6) types of slings and grips for lifting and lowering structures weighing up to 60 tons;

7) requirements for the quality of mounted structures;

8) methods and techniques:

Installation of heavy precast concrete columns, foundation blocks and beams;

Fastening and removal of temporary braces and braces during the installation of structures;

Reeving with pulley rope;

Preparations and installation of anchors with a carrying capacity of up to 60 tons;

Installation of multi-layer wall panels for buildings made of light metal structures and three-layer panels of "Sandwich" type coating;

Installation of laminated and plastic panels;

Sheathing of external walls with a finishing PVC profile of the "Siding" type;

Mounting and dismantling of bulk formwork (block, bulk-portable);

Installation and dismantling of panel, metal and wood-metal formwork from panels with an area of ​​more than 3 m2;

Installation of heavy steel columns and beams of industrial furnaces;

9) features and dismantling procedure:

Complex metal structures;

Complex reinforced concrete structures;

10) Ways:

Installation and fastening of panels, large blocks of walls and cornice blocks;

Installation of pipes with a height of more than 30 m from heat-resistant concrete blocks;

Slinging and slinging of building structures weighing from 25 to 60 tons;

Installation of steel structures of buildings and structures with separate heavy elements or blocks;

Installations of protective casings made of heat-resistant stainless steel;

Conjugation of elements of span structures of bridges with hinged, semi-mounted and balanced assembly;

11) pre-assembly methods:

Steel structures of bridges and assembly of superstructures of bridges on scaffolds;

Steel structures of industrial furnaces;

12) ……… (other requirements for the necessary knowledge)

1.6. The fitter for the installation of steel and reinforced concrete structures of the 5th category must be able to:

1) perform work (operations, actions) at lower levels;

2) carry out slinging and unslinging of heavy structures;

3) select steel ropes for rigging;

4) assemble, install and disassemble mounting masts with a lifting capacity of up to 60 tons;

5) fix the design position of the reinforcement before laying the concrete mix;

6) use rigging equipment with a carrying capacity of up to 60 tons;

7) use rigging equipment with a carrying capacity of up to 60 tons;

8) raise, lower and mount prefabricated concrete and reinforced concrete structures, metal structures at a height and in cramped conditions;

9) mount:

Large-sized prefabricated concrete and reinforced concrete structures;

Large-sized metal structures;

Coverings from the pro-thinned-out flooring;

Membrane coatings;

Light building structures of complex shapes made of aluminum, PVC profiles and soft alloys;

Multi-layer wall panels for buildings made of light steel structures and three-layer "Sandwich" type coating panels;

Laminated and plastic panels;

10) mount and dismantle formwork elements;

11) establish three-dimensional elements of buildings and structures;

12) perform:

Slinging and slinging of heavy building structures;

Pre-assembly of metal structures;

13) have the skills to work with rigging and lifting equipment with a carrying capacity of up to 60 tons;

14) work with a mechanized tool;

15) prepare and install anchors with a carrying capacity of 25 to 60 tons;

16) sheathe the outer walls with a finishing PVC profile of the "Siding" type;

17) comply with the requirements of labor protection while at the construction site, fire safety, electrical safety and safety during installation work;

18) observe the rules of industrial sanitation and labor hygiene, use personal protective equipment;

19) provide first aid to the victim in case of an accident at work;

20) ……… (other requirements for necessary skills)

1.7. ……… (other general provisions)

2. Labor functions

2.1. The labor functions of an installer for the installation of steel and reinforced concrete structures of the 5th category are:

2.1.1. Performing a complex of complex works during the installation of metal, prefabricated concrete and reinforced concrete structures:

1) assembly, installation and disassembly of fixtures and equipment for complex installation work;

2) complex installation of prefabricated concrete and reinforced concrete structures;

3) complex installation of metal structures;

4) performance of auxiliary work in the complex installation of metal and prefabricated concrete and reinforced concrete structures.

2.1.2. Guidance for installers on the installation of steel and reinforced concrete structures of lower qualification (category).

2.2. ……… (other functions)

3. Responsibilities

3.1. Before the start of the working day (shift), a steel and reinforced concrete structure fitter of the 5th category:

1) undergoes a pre-shift (preventive) medical examination in accordance with the established procedure;

2) receives a production assignment;

3) passes, if necessary, briefing on labor protection;

4) accepts the shift;

5) checks the serviceability of devices, tools, inventory, etc., personal protective equipment;

6) ……… (other duties)

3.2. In the process of work, an installer for the installation of steel and reinforced concrete structures of the 5th category:

1) performs the work for which he was instructed and allowed to work;

2) uses overalls, footwear and other personal protective equipment;

3) receive instructions from the immediate supervisor on the performance of the task, safe methods and methods of work;

4) comply with the rules for the use of technological equipment, fixtures and tools, methods and techniques for the safe performance of work;

5) immediately notify the immediate supervisor of all shortcomings found during work;

6) comply with the requirements of personal hygiene and industrial sanitation;

7) ……… (other duties)

3.3. During the working day (shift), the steel and reinforced concrete structure fitter of the 5th category performs the following duties as part of his job functions:

3.3.1. As part of the labor function specified in subparagraph 1 of paragraph 2.1.1 of this instruction:

2) performs:

Assembly and alignment of the embedded parts of the slot block in the conductor before laying the concrete mixture;

Overpass device.

3.3.2. As part of the labor function specified in subparagraph 2 of paragraph 2.1.1 of this instruction:

1) organizes the workplace in accordance with the task and safety requirements when performing this work;

2) performs:

Installation of prefabricated concrete and reinforced concrete foundation blocks weighing over 8 tons and columns weighing up to 20 tons;

Installation of prefabricated reinforced concrete beams with a span of more than 12 m and crane beams;

Installation of large-sized panels of external and internal walls and partition panels made of heavy and light concrete;

Installation of sanitary cabins, blocks of elevator shafts and other three-dimensional elements of buildings and structures;

Installation of reinforced concrete tanks with a capacity of up to 1000 m3;

Installation of pipes with a height of more than 30 m from heat-resistant concrete blocks;

Slinging and slinging of building structures weighing from 25 to 60 tons;

Lifting, moving and lowering with the help of masts, cranes, chevrons, fixed and falling arrows of building structures weighing from 25 to 60 tons.

3.3.3. As part of the labor function specified in subparagraph 3 of paragraph 2.1.1 of this instruction:

1) organizes the workplace in accordance with the task and safety requirements when performing this work;

2) performs:

Installation of profiled flooring coverings;

Installation of a membrane coating;

Installation of steel columns weighing up to 15 tons, crane and other beams weighing from 5 to 15 tons;

Guiding joints during the installation of structures;

Guidance and installation on supports of steel truss and truss trusses with a span of 12 to 24 m;

Pre-assembly of steel truss and sub-truss trusses, columns, blast furnace frames, roof panels;

Installation of load-bearing structures of overpasses, cooling towers, galleries and whatnots;

Installation of longitudinal and transverse ties of steel superstructures of bridges;

Assembly and installation of complex units of span structures of bridges with up to five elements;

Installation of elements of panels of steel superstructures of bridges;

Large-scale assembly and installation of tank structures with a capacity of up to 1000 m3 from rolled blanks, individual drawers or sheets;

Installation of light building structures of complex shapes made of aluminum, PVC profiles and soft alloys;

Slinging and slinging of metal structures weighing up to 60 tons;

Editing deformed metal structures.

3.3.4. As part of the labor function specified in subparagraph 4 of paragraph 2.1.1 of this instruction:

1) organizes the workplace in accordance with the task and safety requirements when performing this work;

2) performs:

Installation and removal of blocks, hoists and chain hoists with a carrying capacity of 25 to 60 tons;

Fasteners for branch blocks;

Procurement and installation of anchors with a carrying capacity of 25 to 60 tons;

Testing of rigging equipment;

Fasteners for chain hoists and branch blocks on masts and structures;

Assembly, installation and dismantling of mounting masts with a lifting capacity of up to 60 tons;

Overpass device;

Mounting and dismantling of bulk formwork (block, bulk-portable);

Installation and dismantling of panel, metal and wood-metal formwork from panels with an area of ​​more than 3 m2;

Installation of multi-layer wall panels for buildings from light metal structures and three-layer panels of "Sandwich" type coating;

Installation of laminated and plastic panels;

Sheathing of external walls with a finishing PVC profile of the "Siding" type;

3) manufactures universal slings.

3.3.5. As part of the labor function specified in clause 2.1.2 of this instruction:

1) issues assemblers for the installation of steel and reinforced concrete structures of a lower qualification (category) assignments for a shift;

2) organizes and coordinates the work of assemblers for the installation of steel and reinforced concrete structures of lower qualification (category);

3) gives instructions and explanations on the performance of work to installers for the installation of steel and reinforced concrete structures of lower qualification (category);

4) carries out quality control of work performed by assemblers for the installation of steel and reinforced concrete structures of lower qualification (category).

3.4. At the end of the working day (shift), a steel and reinforced concrete structure fitter of the 5th category:

1) brings devices, tools into proper condition, transfers them for storage;

2) removes dirt from overalls and safety shoes, if necessary, places them for drying and storage;

3) submits the established reporting;

4) performs an inspection (self-examination);

5) hand over the shift;

6) ……… (other duties)

3.5. As part of the performance of his labor functions, an installer for the installation of steel and reinforced concrete structures of the 5th category:

1) executes the instructions of his immediate supervisor;

2) undergo periodic medical examinations (examinations), as well as extraordinary medical examinations (examinations) in accordance with the procedure established by the legislation of the Russian Federation;

3) ……… (other duties)

3.6. ……… (other terms of duty)

4. Rights

4.1. When performing his labor functions and duties, an installer for the installation of steel and reinforced concrete structures of the 5th category has labor rights provided for by the employment contract concluded with the employee, the Internal Labor Regulations, local regulations of the organization, the Labor Code of the Russian Federation and other acts of labor legislation.

4.2. ……… (other worker rights provisions)

5. Responsibility

5.1. An installer for the installation of steel and reinforced concrete structures of the 5th category is subject to disciplinary liability in accordance with Art. 192 of the Labor Code of the Russian Federation for improper performance through his fault of the duties listed in this instruction.

5.2. The installer for the installation of steel and reinforced concrete structures of the 5th category bears material responsibility for ensuring the safety of the inventory items entrusted to him.

5.3. An installer for the installation of steel and reinforced concrete structures of the 5th category for committing offenses in the course of his activities, depending on their nature and consequences, is brought to civil, administrative and criminal liability in the manner prescribed by law.

5.4. ……… (other liability provisions)

6. Final provisions

6.1. This instruction was developed on the basis of the Professional Standard "", approved by the Order of the Ministry of Labor and Social Protection of the Russian Federation of March 23, 2015 N 185n, taking into account ... ... ... (details of the organization's local regulations)

6.2. Familiarization of the employee with this job description is carried out upon employment (before signing the employment contract).

The fact that the employee is familiarized with this job description is confirmed by ……… (signature on the familiarization sheet, which is an integral part of this instruction (in the journal of familiarization with job descriptions); in a copy of the job description kept by the employer; otherwise)

6.3. ……… (other final provisions).

This job description has been translated automatically. Please note that automatic translation does not provide 100% accuracy, so there may be minor translation errors in the text.

Instructions for the position " Construction fitter of the 5th category", presented on the site, complies with the requirements of the document - "DIRECTORY of qualification characteristics of workers' professions. Issue 64. Construction, installation and repair and construction work. (Including additions approved by: order of the State Committee for Construction and Architecture N 25 of 08.08.2002, N 218 of 12.22.2003, N 149 of 08.29.2003, letter of the State Committee for Construction and Architecture N 8 / 7-1216 of December 15, 2004, by order of the Ministry of Construction, Architecture and Housing and Communal Services N 9 of December 2, 2005, N 163 of May 10, 2006 N 399 of December 5, 2006, by order of the Ministry of Regional Development , construction and housing and communal services of Ukraine N 558, 12/28/2010)", which was approved by order of the State Committee for Construction, Architecture and Housing Policy of Ukraine on 10/13/1999 N 249. Agreed by the Ministry of Labor and Social Policy of Ukraine. Entered into force from 1 January 2000
The status of the document is "valid".

Preface to job description

0.1. The document comes into force from the moment of its approval.

0.2. Document developer: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

0.3. Document approved: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

0.4. Periodic verification of this document is carried out at intervals not exceeding 3 years.

1. General Provisions

1.1. The position "Building fitter of the 5th category" belongs to the category "Workers".

1.2. Qualification requirements - vocational education. Advanced training and work experience as a construction assembler of the 4th category - at least 1 year.

1.3. Knows and applies:
- methods and techniques for mounting heavy prefabricated and reinforced concrete columns, prefabricated reinforced concrete railings, foundation blocks, beams, scaffolds on a support, precast concrete structures and single-block crossbars on bridges for highways, reinforced concrete box-shaped blocks of span structures from slab elements on finished scaffolds during construction subways and highways;
- methods of installation and fastening of panels, large blocks of walls, cornice blocks;
- methods of installation of steel structures of buildings and structures from individual heavy elements or blocks;
- methods of manufacturing, assembly and installation of frames;
- rules for installation and disassembly of supports from sleeper cages;
- methods and techniques for mounting heavy steel columns and beams of industrial furnaces;
- methods of installation and fastening of large blocks and panels lined with heat-resistant concrete;
- ways of connecting steel structures with heat-resistant concrete blocks;
- ways to install protective casings made of stainless steel;
- methods of pre-assembly of steel structures of bridges and drawing up spans of bridges on scaffolding;
- ways of connecting the elements of span structures of bridges during hinged, semi-hanging and balanced drawing up;
- methods and techniques for assembling, installing rigging, mounting and other lifting equipment and devices during pre-assembly and installation of complex structures of buildings and industrial facilities, pre-assembly of structures and drawing up spans of bridges on scaffolding;
- ways to perform complex slinging of structures and blocks;
- methods of laying complex walls;
- methods of laying walls of medium complexity with simultaneous cladding;
- methods for establishing monolithic concrete bridge supports during the supply of concrete on land and from watercraft without facing;
- rules for acceptance of flat reinforcing cages and blocks, arrangement of rods during the assembly of spatial frames, armored deck blocks and truss packages according to sketches and drawings;
- the procedure for reconciliation of installed reinforcement and reinforcing structures;
- methods of manufacturing stress-reinforced structures and products;
- rules for cleaning the formwork of complex structures;
- rules and techniques of assembly, installation of complex fittings;
- methods for controlling the strength and water resistance of concrete;
- device and rules for the operation of manual mechanized, electric and pneumatic tools, mounting guns, mounting equipment, instruments, machine tools;
- rules for compliance with the sequence of work in accordance with the technological maps;
- rules for safe work with manual and mechanized winches, hoists;
- requirements for the quality of work;
- rules for compliance with fire and electrical safety;
- rules and regulations on labor protection when performing work at height, in pits, inside sheet piling, below the water level.

1.4. A construction fitter of the 5th category is appointed to the position and dismissed by order of the organization (enterprise / institution).

1.5. The construction fitter of the 5th category reports directly to _ _ _ _ _ _ _ _ _ _ .

1.6. A construction fitter of the 5th category directs the work _ _ _ _ _ _ _ _ _ _ .

1.7. A construction fitter of the 5th category during his absence is replaced by a person appointed in the prescribed manner, who acquires the appropriate rights and is responsible for the proper performance of the duties assigned to him.

2. Description of work, tasks and job responsibilities

2.1. Performs complex work during the installation and assembly of buildings and structures from individual elements, enlarged blocks, masonry and repair of stone structures of buildings, bridges, industrial and hydraulic structures, manufacture and installation of reinforcement and reinforcing structures, concreting of monolithic reinforced concrete structures.

2.2. Knows, understands and applies the current regulatory documents relating to its activities.

2.3. Knows and fulfills the requirements of regulatory acts on labor and environmental protection, complies with the norms, methods and techniques for the safe performance of work.

3. Rights

3.1. The 5th category construction fitter has the right to take actions to prevent and eliminate the occurrence of any violations or inconsistencies.

3.2. A construction fitter of the 5th category has the right to receive all social guarantees provided for by law.

3.3. A construction fitter of the 5th category has the right to demand assistance in the performance of his duties and the exercise of rights.

3.4. The 5th category construction fitter has the right to demand the creation of organizational and technical conditions necessary for the performance of official duties and the provision of the necessary equipment and inventory.

3.5. The 5th category construction fitter has the right to get acquainted with the draft documents relating to his activities.

3.6. The 5th category construction fitter has the right to request and receive documents, materials and information necessary to perform his job duties and instructions from the management.

3.7. A construction fitter of the 5th category has the right to improve his professional qualifications.

3.8. The 5th category construction fitter has the right to report all violations and inconsistencies identified in the course of his activities and make proposals for their elimination.

3.9. A construction fitter of the 5th category has the right to get acquainted with the documents defining the rights and obligations of the position held, the criteria for assessing the quality of the performance of official duties.

4. Responsibility

4.1. The 5th category construction fitter is responsible for non-fulfillment or untimely fulfillment of the duties assigned by this job description and (or) non-use of the rights granted.

4.2. A construction fitter of the 5th category is responsible for non-compliance with the rules of internal labor regulations, labor protection, safety, industrial sanitation and fire protection.

4.3. A 5th grade construction fitter is responsible for disclosing information about an organization (enterprise/institution) that is classified as a trade secret.

4.4. The 5th category construction fitter is responsible for non-fulfillment or improper fulfillment of the requirements of the internal regulatory documents of the organization (enterprise / institution) and the legal orders of the management.

4.5. The 5th category construction fitter is responsible for offenses committed in the course of his activities, within the limits established by the current administrative, criminal and civil legislation.

4.6. The 5th category construction fitter is responsible for causing material damage to the organization (enterprise / institution) within the limits established by the current administrative, criminal and civil legislation.

4.7. The 5th category construction fitter is responsible for the misuse of the granted official powers, as well as their use for personal purposes.

5. Examples of work

5.1. Installation of prefabricated concrete and reinforced concrete foundation blocks weighing more than 8 tons, columns weighing up to 20 tons, column capitals, prefabricated reinforced concrete beams with a span of more than 12 m, crane beams, large-sized panels of external and internal walls, partition panels made of heavy and lightweight concrete, partition walls and cornerstones large blocks, cornices, etc.

5.2. Installation of sanitary cabins, blocks of elevator shafts, other three-dimensional elements of buildings.

5.3. Drawing up and checking the embedded parts of the slot block in the jig before concreting.

5.4. Installation, dismantling of metal and wooden panel formwork from panels with an area of ​​more than 3 m2, volumetric formwork (block, tunnel, volume-adjustable, etc.).

5.5. The device and dismantling of the ceiling over the pits.

5.6. Installation of supporting walls and supports from contour blocks with filling.

5.7. Lifting, installing and checking support blocks.

5.8. Arrangement of reinforced concrete ladders on slopes with embankment height or excavation depth up to 7 m.

5.9. Installation in the design position and removal of guide metal frames for driving piles, shell piles of river and coastal supports.

5.10. Lifting and installation of prefabricated elements of superstructures, checking and fixing them in the design position.

5.11. Masonry of complex walls under plaster and with opening joints simultaneously with masonry of walls, medium complexity and complex walls with simultaneous wall cladding, lightweight structures of medium complexity and complex.

5.12. Masonry of rectangular columns, cornices, wedge-shaped lintels, wells of variable cross section, collectors of round and tented sections.

5.13. Repair of wedge-shaped lintels with dismantling of existing masonry.

5.14. Masonry with simultaneous facing with decorative colored bricks according to a given pattern.

5.15. Natural stone masonry.

5.16. Figurative stupefaction of a brick.

5.17. Assembly and installation of complex reinforcing meshes and flat reinforcing cages (regardless of weight), double reinforcing mesh weighing more than 100 kg, simple spatial reinforcing cages.

5.18. Preparing fittings for bathtub welding at height.

5.19. Knitting reinforcing cages in pits.

5.20. Decomposition of reinforcing ropes or bundles and their tension.

5.21. Collection of reinforcement for structures that are installed in sliding formwork.

5.22. Installation of fittings from individual rods from roz_channym arranged according to the drawings in slab bases, beamless and ribbed ceilings, flights of stairs, etc.

5.23. Installation of anchor bolts and embedded parts in complex structures.

5.24. Installation of monolithic concrete bridge supports during the supply of concrete from boats and on land without facing.

5.25. Laying concrete mixture into the formwork of thin-walled structures of domes, vaults, tanks, stress-reinforced monolithic structures, etc.

5.26. Manufacture of stress-reinforced reinforced concrete products (span structures of bridges and overpasses, long piles and supports, trusses and beams of large spans) at construction sites.

5.27. The device of bored piles.

Job installer 6 category 6 category vacancy installer 6 category 6 category in Moscow. Vacancy installer 6 category 6 category from a direct employer in Moscow job advertisements installer 6 category 6 category Moscow, vacancies for recruitment agencies in Moscow, looking for a job installer 6 category 6 category through recruitment agencies and from direct employers, vacancies installer 6 category 6 category with work experience and without work experience. The site of announcements about part-time work and work Avito Moscow job vacancies installer 6 category 6 category from direct employers.

Work in Moscow installer 6 category 6 category

Site work Avito Moscow work fresh vacancies installer 6 category 6 category. On our site you can find a highly paid job as an installer of the 6th category of the 6th category. Look for a job as an installer of the 6th category of the 6th category in Moscow, view vacancies on our job site - a job aggregator in Moscow.

Avito jobs Moscow

Work installer 6 category 6 category on the site in Moscow, vacancies installer 6 category 6 category from direct employers Moscow. Vacancies in Moscow without work experience and highly paid with work experience. Jobs installer 6 category 6 category for women.

§ 188. Installer for the installation of steel and reinforced concrete structures of the 2nd category

Job Description. Slinging of steel, concrete and reinforced concrete structures. Slinging structures at the installation site. Threading of bolts and nuts. Performing work using a manual winch. Cleaning surfaces for insulation. Re-preservation of hardware, with the exception of high-strength bolts. Manual punching of holes and furrows in concrete and reinforced concrete structures. Installing and removing bolts. Sorting of building structures by brands. Laying simple blocks in the construction of foundations.

Must know: main types of rigging equipment; types of slings and gripping devices; signaling rules during installation; purpose and rules for the use of the main tool and fixtures during the installation of building structures; ways to perform slinging structures.

§ 189. Installer for the installation of steel and reinforced concrete structures of the 3rd category

Job Description. Cleaning joints of assembled structures. Tightening of assembly bolted connections. Installation of self-tapping bolts. Re-preservation of high-strength bolts. Coating with kerosene and chalk of welds when checking their density. Straightening of shaped steel on manual screw presses. Laying of paving slabs. Temporary fastening of structures. Insulation of concrete and reinforced concrete structures. Concrete embedding of joints and multiple places. Sealing with brick or concrete ends of beams, furrows, nests, potholes and holes. Installation and dismantling of mobile buildings and structures from inventory block containers. Installation of gaskets. Installation of prefabricated partitions and internal walls made of gypsum panels on a metal frame. Sealing joints with special sealants by applying them with a brush or spatula. Installation and dismantling of large-panel formwork from ready-made panels. Manual preparation of thiokol and acrylic sealants. Knitting rigging knots. Unwinding and winding ropes. Fastening of steel ropes with bolt clamps. Installation and removal of blocks, hoists, chain hoists, winches and jacks with a lifting capacity of up to 10 tons.

Must know: main types of parts of steel and prefabricated concrete and reinforced concrete structures; types of main rigging and mounting equipment and fixtures; types of rigging knots; ways of fastening ropes with bolt clamps; rules for transportation and storage of structures and products; methods of slinging building structures and their slinging; methods of temporary fastening of structures using devices; methods for checking the density of welds; basic properties and grades of concrete mixtures; rules for preparing surfaces for insulation; the device of electrified and pneumatic tools and the rules for working with them; ways to protect metal from corrosion; methods of signaling when lifting, lowering and installing building structures, when mounting them at a height and in cramped conditions.

§ 190. Assembler for the installation of steel and reinforced concrete structures of the 4th category

Job Description . Installation of prefabricated concrete and reinforced concrete foundation blocks weighing up to 8 tons, heads and pile grillage blocks. Installation of prefabricated reinforced concrete beams with a span of up to 12 m (except for crane beams). Installation of prefabricated suspended ceilings from gypsum panels on a metal frame. Installation of prefabricated reinforced concrete panels and floor slabs and coatings, including floors of HPP installation sites. Installation of prefabricated reinforced concrete passenger platforms. Installation of flights of stairs and platforms, ordinary large blocks of walls and balcony blocks. Installation of studs for hanging armored mesh. Installation of reinforcing and armored meshes in reactors. Installation of steel frames of industrial furnaces weighing up to 5 tons and heat-shielding structures of furnaces from blocks weighing up to 1 t. span up to 12 m. Installation of pipes up to 30 m high from heat-resistant concrete blocks. Laying of prefabricated reinforced concrete slabs of bridges and flyovers. Cladding with slabs of channels and slopes of dams. Sealing of joints of beams, girders and crossbars with columns. The device for filling openings and partitions from glass profiles. Caulking, pouring and jointing of seams and joints in prefabricated reinforced concrete structures. Installation of steel structures: stairs, fence platforms, support posts, brackets, scaffolding, scaffolding, etc., as well as structures weighing up to 5 tons: beams, girders, half-timbered elements, ties, etc. Sheathing with sheet steel of steel and concrete structures. Installation of steel roofing. Fastening permanent bolted connections. Installation of high strength bolts. Anticorrosive painting of embedded parts. Concreting of slot blocks of embedded parts. Pre-installation of embedded parts. Installation in the grooves of the gates of hydraulic structures and trash grates. Assembly of shells and links of oversized pipelines of hydraulic structures. The device of thermal insulation of external joints of prefabricated buildings with mineral and synthetic materials. Sealing joints with special sealants using pneumatic and electric tools, as well as sealing gaskets (gernit, poroizol, etc.). Fixing parts to concrete surfaces using power tools. Applying epoxy adhesive to reinforced concrete structures. Installation and dismantling of panel, metal and wood-metal formwork from panels with an area of ​​up to 3 m2. Installation and removal of blocks, hoists and chain hoists with a carrying capacity of more than 10 to 25 tons. Enlarged assembly of blocks of embedded parts. Laying of steel flooring on platforms, brake farms. Slinging and slinging of structures weighing over 25 tons. Fastening and removal of temporary braces and braces during the installation of structures. Preparation and installation of anchors with a carrying capacity of up to 25 tons. Construction of temporary stands from sleepers.

Must know: basic properties and grades of building steels; concrete grades and types of prefabricated concrete, reinforced concrete and steel structures; methods of assembly and installation of structures from individual elements; methods of mounting pipes up to 30 m high from heat-resistant concrete blocks; methods and techniques for mounting reinforcing and armored meshes in reactors; methods and techniques for assembling and installing rigging and lifting equipment and fixtures during the installation of structures weighing up to 25 tons; ways of slinging building structures; ways of connecting and fastening structural elements; installation of rigging equipment with a carrying capacity of up to 25 tons; types of slings and grips for lifting and lowering structures; tolerances in the manufacture and installation of reinforcement structures; methods of using rigging fixtures and mechanisms for mounting reinforced structures; methods of paving during the installation of structures; basic requirements for the quality of mounted structures; the device of a mechanized tool and the rules for its operation; methods and techniques for applying epoxy glue to reinforced concrete structures; features and procedure for the dismantling of steel and reinforced concrete structures; types of sealing gaskets for sealing joints and methods for sticking them.

§ 191. Fitter for the installation of steel and reinforced concrete structures of the 5th category

Job Description . Installation of prefabricated concrete and reinforced concrete foundation blocks weighing over 8 tons and columns weighing up to 20 tons. Installation of column capitals. Installation of prefabricated reinforced concrete beams with a span of more than 12 m and crane beams. Installation of large-sized panels of external and internal walls and partition panels made of heavy and light concrete. Installation of sanitary cabins, blocks of elevator shafts and other three-dimensional elements of buildings. Installation of wall and corner large blocks and cornices. Assembly and alignment of the embedded parts of the slot block in the conductor before laying the concrete mixture. Installation of NPP pipe passages. Installation of embedded parts of segmental valves with sealing devices. Installation of steel facings, confusers, diffusers. Installation of straight sections of oversized pipelines of hydraulic structures. Installation of prefabricated reinforced concrete floor slabs for spillway dams and spiral chambers, stop plates and slabs for dowels, inspection shafts and facing blocks of hydroelectric power plant structures. Reinforcement of the guide grillage with ties and a section of the truss slab, as well as the installation of berths from precast concrete slabs using floating cranes. Installation of reinforced concrete shells of giant arrays. Installation of steel frames of industrial furnaces weighing more than 5 tons and heat-shielding structures of furnaces from blocks weighing more than 1 ton. refractory concrete blocks. Installation and removal of mounting platforms when installing pipes. Connection of pipe blocks with high-strength studs. Installation of prefabricated hogs and gas ducts. Installation of protective casings made of heat-resistant stainless steel. Installing a rail track in a tunnel kiln. Pre-assembly of steel truss and truss trusses, columns, blast furnace frames, roof panels, etc. Enlargement assembly and installation of coating blocks. Membrane installation. Installation on supports of steel truss and truss trusses with a span of 12 to 24 m. Installation of steel columns weighing up to 15 tons, crane and other beams weighing from 5 to 15 tons. Installation of load-bearing structures of overpasses, cooling towers, galleries and whatnots. Installation of panel elements of steel superstructures of bridges. Assembly and installation of complex units of span structures of bridges with the number of elements up to 5. Statement of longitudinal and transverse braces of steel span structures of bridges. Installation of reinforced concrete tanks with a capacity of up to 1000 m3. Installation of structures made of aluminum and soft alloys. Installation of multi-layer wall panels (for buildings made of light metal structures) and three-layer sandwich panels. The device of coverings from the pro-thinned-out flooring. Slinging and slinging of heavy building structures. Production of universal slings. Attachment of outlet blocks. Testing of rigging equipment. Manufacture and installation of anchors with a carrying capacity of more than 25 to 60 tons. Assembly, installation and disassembly of mounting masts with a carrying capacity of up to 60 tons. Lifting, moving and lowering with the help of masts, cranes, chevrons, fixed and falling arrows of structures weighing more than 25 to 60 tons. Installation and dismantling of volumetric formwork (block, volume-adjustable, etc.) and formwork of the "Modostr" type. Large-scale assembly and installation of tank structures with a capacity of up to 1000 m3 from rolled blanks, individual drawers or sheets. Installation and removal of pulleys, hoists, chain hoists, crane beams with a lifting capacity of more than 25 to 40 tons. Fastening of chain hoists and branch blocks on masts and structures. Anticorrosive painting of metal structures and embedded parts. Installation and dismantling of panel, metal and wood-metal formwork from panels with an area of ​​more than 3 m2.

Must know: methods and techniques for mounting heavy precast concrete columns, foundation blocks and beams; methods of installation and fastening of panels, large blocks of walls and cornice blocks; methods of mounting steel structures of buildings and structures with separate heavy elements or blocks; methods and techniques for mounting heavy steel columns and beams of industrial furnaces; methods of installation and fastening of panels lined with heat-resistant concrete and large blocks; methods of pre-assembly of steel structures of industrial furnaces; methods of mounting pipes with a height of more than 30 m from heat-resistant concrete blocks; methods of interfacing steel structures with heat-resistant concrete blocks; ways to install protective covers made of heat-resistant stainless steel; methods of pre-assembly of steel structures of bridges and assembly of spans of bridges on scaffolds; ways of pairing elements of span structures of bridges in hinged, semi-mounted and balanced assembly; features and procedure for dismantling complex steel and reinforced concrete structures; methods and techniques for assembling and installing rigging and lifting equipment and fixtures during pre-assembly and installation of building and industrial structures, as well as when assembling structures of bridge spans on scaffolds; methods of slinging and slinging of heavy structures; device and rules for the use of lifting equipment; methods for selecting steel ropes for rigging; terms of wear and methods of lubrication of steel ropes.

§ 192. Installer for the installation of steel and reinforced concrete structures of the 6th category

Job Description . Pre-assembly of reinforced concrete frames, beams and trusses with subsequent tension of reinforcement. Pre-assembly and installation of prestressed reinforced concrete trusses, consisting of several parts. Installation of reinforced concrete structures of buildings and structures from prefabricated frames. Final alignment of embedded parts. Installation and final alignment of slot blocks with embedded parts. Installation of pressure pipeline supports. Installation of steel structures of supports and cableway stations and cable cranes, as well as steel ropes at a height of structures over 70 m. Installation of prefabricated reinforced concrete columns weighing more than 20 tons. , dams and sluices, slabs and floors of sluice galleries and suction pipes. Installation of space frames and grillages for driving piles. Installation of spatial elements of silos. Installation and final alignment of steel columns, crane beams, steel frame structures of buildings and industrial structures with an element or block mass of more than 15 to 25 tons, as well as trusses with a span of more than 24 to 36 m. factories, etc. Enlarged assembly of structures of buildings and structures of nuclear power plants, thermal power plants, hydroelectric power plants, etc. on an assembly stand or a plaz-conductor into spatial blocks weighing up to 50 tons. Pre-assembly of furnace structures from panels and blocks. Installation of industrial furnaces and pipes with enlarged units at a height of construction up to 150 m. Installation of industrial furnaces on the stand with subsequent sliding into the design position. Installation of prefabricated pipes by turning around a hinge fixed on the foundation. Installation of lining of rotary kilns from heat-resistant concrete blocks. Acquisition of parts according to assembly diagrams for the installation of buildings, industrial structures and spans of bridges. Assembly and installation of complex units of span structures of bridges with the number of elements over 5 to 8. Installation of supporting parts of span structures of bridges. Installation of the upper rolling tracks and their fastenings to the truss nodes. Installation of television and radio towers with a height of structures up to 100 m. Installation of metal and reinforced concrete cylindrical tanks with a capacity of over 1000 to 3000 m3. Installation of structures by sliding and turning method. Assembly of composite reinforced concrete beams of superstructures of bridges. Installation of metal flue gas chimney shafts up to 150 m high. Equipment, installation and movement of mounting masts with a lifting capacity of over 60 to 100 tons. Slinging, lifting and lowering structures weighing over 60 to 100 tons.

Must know: methods of pre-assembly of complex structures of buildings and industrial facilities; methods of atypical slinging of structures and volumetric blocks; rules and methods for performing rigging during installation; methods of installation of large overall and heavy structures of buildings and industrial facilities; ways of assembling, sliding and installing spans of bridges; methods and techniques for assembling and installing complex types of rigging and lifting equipment and fixtures; methods of installation of metal and reinforced concrete tanks; methods of pre-assembly of steel structures with elements of industrial furnaces made of heat-resistant concrete and reinforced concrete; methods of pre-assembly and installation of pipes from blocks (tsarg); methods of installation of industrial furnaces from prefabricated heat-resistant concrete and reinforced concrete by the method of shifting and pipes by the method of rotation; methods of mounting the lining of rotary kilns from heat-resistant concrete blocks; features and procedure for the dismantling of complex steel and reinforced concrete structures.

§ 193. Installer for the installation of steel and reinforced concrete structures of the 7th category

Job Description. Enlarged assembly of structures of buildings and structures of nuclear power plants, thermal power plants, hydroelectric power plants, etc. on an assembly stand or a plaz-conductor into spatial blocks weighing more than 50 tons. Installation of spatial blocks of structures weighing more than 50 tons. Equipment, installation and movement of mounting masts with a carrying capacity of more than 100 tons. Installation of fittings and compensators for oversized pipelines of hydraulic structures. Installation of stress-reinforced beams and floor trusses, regardless of their span. Installation and final alignment of steel columns, crane beams and other steel structures of the frames of buildings and industrial structures with an element or block mass of more than 25 tons, as well as trusses with a span of more than 36 m. Assembly and installation of complex units of bridge spans with more than 8 elements. Installation metal and reinforced concrete cylindrical tanks with a capacity of more than 3000 m3, as well as buried trench, spherical tanks and gas tanks, regardless of capacity. Installation of metal structures of chimneys using helicopters and other aircraft (aircraft). Installation of metal gas exhaust shafts of chimneys with a height of over 150 m. Installation of television and radio towers with a height of structures over 100 m. Installation of cable-stayed structures. Installation of prefabricated reinforced concrete exhaust towers for cooling towers. Installation of the nuclear power plant reactor dome. Installation of multi-stem smoke and ventilation pipes from enlarged blocks.

Must know: methods of assembly and installation of large and heavy structures of buildings and industrial facilities; methods and techniques for assembling and installing complex types of rigging and lifting equipment and fixtures; methods of complex non-standard slinging of structures and spatial blocks of structures; features of installation of structures of buildings and structures with the help of helicopters and other aircraft (aircraft; rules for lifting structures by helicopter to a height, alignment when a helicopter enters the installation area; methods of installation of multi-barrel high-altitude smoke and ventilation pipes from enlarged blocks; types of portable radio stations and handling rules with them.

Requires secondary vocational education.

Hump ​​yard equipment installer

\Typical job description of an Assembler for the installation of steel and reinforced concrete structures of the 5th category

Job description of the Installer for the installation of steel and reinforced concrete structures of the 5th category

Position: Assembler for the installation of steel and reinforced concrete structures of the 5th category
Subdivision: _________________________

1. General Provisions:

    Subordination:
  • The assembler for the installation of steel and reinforced concrete structures of the 5th category is directly subordinate to ..............................................
  • The fitter for the installation of steel and reinforced concrete structures of the 5th category follows the instructions .............................................. ...............

  • (instructions of these employees are carried out only if they do not contradict the instructions of the immediate supervisor).

    Substitution:

  • The fitter for the installation of steel and reinforced concrete structures of the 5th category replaces ....................... ............................................
  • Replaces fitter for steel and reinforced concrete structures of the 5th category....................................... .........................................
  • Recruitment and dismissal:
    An installer for the installation of steel and reinforced concrete structures is appointed to the position and dismissed by the head of the department in agreement with the head of the department.

2. Qualification requirements:
    Must know:
  • methods and techniques for mounting heavy precast concrete columns, foundation blocks and beams. Methods for installing and fixing panels, large wall blocks and cornice blocks. Methods for mounting steel structures of buildings and structures with separate heavy elements or blocks. Methods and techniques for mounting heavy steel columns and beams of industrial furnaces. Methods for installing and fastening panels lined with heat-resistant concrete and large blocks. Methods for pre-assembly of steel structures of industrial furnaces. Methods for mounting pipes with a height of more than 30 m from heat-resistant concrete blocks. Ways of conjugation of steel structures with blocks of heat-resistant concrete. Installation methods for stainless steel protective covers. Methods for pre-assembly of steel structures of bridges and assembly of spans of bridges on scaffolds. Ways of interface of elements of superstructures of bridges at hinged, semi-mounted and balanced assembly. Methods and techniques for assembling and installing rigging and lifting equipment and fixtures during pre-assembly and installation of complex structures of buildings and industrial facilities, as well as pre-assembly of structures and assembly of bridge spans on scaffolds. Methods for complex slinging of structures and blocks.
3. Job responsibilities:
  • Performing complex installation work when assembling structures of buildings and structures from individual elements and enlarged blocks.
p. 1 Job description Assembler for the installation of steel and reinforced concrete structures
p. 2 Job description Assembler for the installation of steel and reinforced concrete structures

4. Rights

  • The assembler for the installation of steel and reinforced concrete structures has the right to give instructions to his subordinate employees, tasks on a range of issues included in his functional duties.
  • The assembler for the installation of steel and reinforced concrete structures has the right to control the fulfillment of production tasks, the timely execution of individual assignments by employees subordinate to him.
  • The assembler for the installation of steel and reinforced concrete structures has the right to request and receive the necessary materials and documents related to the issues of his activities and the activities of employees subordinate to him.
  • The assembler for the installation of steel and reinforced concrete structures has the right to interact with other services of the enterprise on production and other issues that are part of his functional duties.
  • The installer for the installation of steel and reinforced concrete structures has the right to get acquainted with the draft decisions of the management of the enterprise relating to the activities of the Division.
  • The installer for the installation of steel and reinforced concrete structures has the right to propose for consideration by the manager proposals for improving the work related to the duties provided for in this Job Description.
  • The installer for the installation of steel and reinforced concrete structures has the right to submit proposals for the consideration of the head of the proposal to encourage distinguished employees, to impose penalties on violators of production and labor discipline.
  • The installer for the installation of steel and reinforced concrete structures has the right to report to the manager on all identified violations and shortcomings in connection with the work performed.
5. Responsibility
  • The assembler for the installation of steel and reinforced concrete structures is responsible for improper performance or non-performance of his duties stipulated by this job description - to the extent determined by the labor legislation of the Russian Federation.
  • The installer for the installation of steel and reinforced concrete structures is liable for violation of the rules and regulations governing the activities of the enterprise.
  • When transferring to another job or dismissal from office, the Steel and Reinforced Concrete Structural Assembler is responsible for the proper and timely handover of cases to the person taking up this position, and in the absence of such, to the person replacing him or directly to his supervisor.
  • The installer for the installation of steel and reinforced concrete structures is liable for offenses committed in the course of his activities - within the limits determined by the current administrative, criminal and civil legislation of the Russian Federation.
  • The installer for the installation of steel and reinforced concrete structures is responsible for causing material damage - within the limits determined by the current labor and civil legislation of the Russian Federation.
  • The erector of steel and reinforced concrete structures is responsible for complying with the current instructions, orders and orders for the preservation of trade secrets and confidential information.
  • The installer for the installation of steel and reinforced concrete structures is responsible for compliance with the internal regulations, safety and fire safety rules.
This job description was developed in accordance with (name, number and date of the document)

Head of structural

Loading...Loading...